BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 17, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a civil project in Pascagoula, Mississippi. Completed plans call civil work for a bridge / tunnel, road / highway and water / sewer project.

Award Details Contract Award Date: Apr 22, 2020 Contract Award Number: 68HE0420C0003 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 082785585 Contractor Awarded Name: Kemron Environmental Services, Inc. Contractor Awarded Address: Base and All Options Value (Total Contract Value): $2633545.93 **As of April 22, 2020, this project has not yet been awarded. The project is expected to be awarded by this time next week. Construction Contract for Installation of ClosureTurf at the Mississippi Phosphate Phase 1B project area, Former Mississippi Phosphate Site, Pascagoula, Mississippi. Work will be performed in accordance with the drawings, specifications, and attachments A through E attached to this Invitation for Bid (IFB). This action is being solicited pursuant to FAR Part 14 as an Invitation for Bid (IFB). This solicitation is an unrestricted procurement under North American Industry Classification (NAICS) Code is 237990 Other Heavy and Civil Engineering Construction. Project magnitude is between $1,000,000 and $5,000,000. Failure to submit a bid on all items shall result in rejection of the bid. All questions and requests for information regarding this Invitation for Bids (IFB) must be received Not Later Than 12:00PM March 13, 2019 in order to minimize the need to extend the bid opening date. Questions shall be submitted through FedConnect. Government reserves the right to include additive bid items taken at time of award in the Base CLIN to facilitate and simplify scheduling and/or payment processing. The work includes the phased construction of grading, subgrade preparation, liner installation, downslope channels, access roads, and temporary culverts on the East Gypsum Stack. Phase 1B (Drawing C-050) is the Construction Plan and includes the following: a. Prepare EGS subgrade for synthetic turf cover system placement. Grade side slopes, benches, downslope channels and access roads of the western face of the EGS. b. Construct temporary gypsum berms bridging the south Water Return Ditch (WRD) for HDPE culvert installation. c. Install HDPE culverts to convey Stormwater runoff collecting in the micro detention at the EGS baseline through south WRD and under Access Road #2 before discharging to the existing drainage channel along the southern boundary of the MPC Environmental Trust Parcel. Install HDPE culverts through gypsum berms connecting the WRD cells. d. Place synthetic turf cover system over the southern face of the EGS prepared subgrade. See sheet C-500 for details. MBE : 30.3% WBE : 6.9%

Award

Roads / Highways

$2,633,546.00

Public - Federal

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
79
Bidding Soon
719
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2020

May 1, 2020

Project location map

601 Industrial Rd, Pascagoula, MS

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.