BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a road / highway in Toppenish, Washington. Design plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

STIP ID 509703N39 US 97/SR 22 Intersection - Upgrade Signal and Illumination Upgrade illumination system and rebuild signal system. The electrical lighting system and signal system at the US 97/SR 22 Intersection on US 97 at Toppenish have deteriorated due to age. This project will replace the lighting system and rebuild the signal to ensure adequate lighting and signal function for the intersection area. As of February 10, 2023, this project is in a Design status. Preliminary engineering is expected to begin in the third quarter of 2021 and environmental design is expected to be complete in the fourth quarter of 2021. The contract advertisement is expected in frist quarter of 2024 and construction is anticipated to be operationally complete in the fourth quarter of 2024. WSDOT - US 97/SR 22 Intersection - Upgrade Signal and Illumination *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Roads / Highways

$1,284,000.00

Public - State/Provincial

Outdoor Lighting, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
7
Bidding Soon
129
All Active Projects
50
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2024

img_map_placeholder

WA-22 & US-97, Toppenish, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.