BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Innisfail, Alberta. Completed plans call for site work for a water / sewer project.

The objectives for the sanitary sewer mains and manholes rehabilitation are to prevent further structural deterioration, prevent corrosion, prevent root intrusion, prevent/reduce infiltration and improve flow characteristics. This contract requires the use of cured-in-place pipe (CIPP) technology for the completion of the sanitary sewer rehabilitation as identified within this document. The method of cure for the CIPP technology is open to any of the following methods; Hot Water, Steam or UV cured CIPP products. The Proponent shall identify within their submission their intended curing method for executing the project. The CIPP lining will be a tight fit to the inside of the existing sewer and conform closely to the shape of the existing sewer without bridging, gaps, or voids. For the rehabilitation of existing sanitary sewer manholes a combination of techniques can be used, to be identified by the Proponent in their proposal. The scope of the 2020 Rehabilitation project includes all necessary design, labour, equipment, and materials required to successfully rehabilitate the sanitary sewer mains and manholes identified and in accordance with the requirements in this document. In general, this includes the following: Notifications to the public; Flow control and/or flow bypass; Traffic control; Liaison and other measures for properties connected to the sewer that will be affected by the work; Confirmation of existing sewer conditions (2018 CCTV inspection and reports provided by Town; see also Section 2.2) Measuring the size and length of sewers sections to confirm/determine the liner design parameters; Cleaning and preparation of sewer sections; CCTV inspection after cleaning and preparation and before lining (OPTIONAL); Installation and curing of CIPP lining; Reinstatement of service connections; CCTV inspection of completed sewer section rehabilitation; All associated work required in the course of and for the rehabilitation such as overall management including safe work practices and all approval, permissions and necessary permits. Bid value not released for publication.

Award

Water / Sewer

$700,000.00

Public - City

Site Work

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
11
Bidding Soon
289
All Active Projects
106
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2020

February 24, 2020

img_map_placeholder

Multiple Locations, Innisfail, AB


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.