EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 19, 2020 at 7:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Flagstaff, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of February 19, 2020, this project has awarded to Kinney Construction Services amount of $1,325,256.00 . The start and completion date is not yet available. The Sheep Crossing Trail is a planned Flagstaff Urban Trails System (FUTS) trail, approximately 0.8 miles in length, 10 feet in width, which will connect the Ponderosa FUTS Trail along the west side of Pulliam Drive with the Sinclair Wash FUTS Trail in Fort Tuthill County Park. This multi-use, non-motorized, aggregate mix trail will allow users the opportunity to navigate under Interstate 17, connecting existing trails on the east and west sides of the Interstate, just north of the John Wesley Powell Boulevard and Interstate 17 Interchange. This trail segment is also part of ultimate alignment of the Flagstaff Loop Trail, a 44-mile system of FUTS, County, and National Forest trails that circumnavigate the community and provide a world-class recreational opportunity in proximity to the city. This summary is not a comprehensive account of the work, the plan sets, specifications, and special provisions shall be considered a comprehensive detail of the work to be performed. Note: Bidders are responsible for considering any underground rock work they deem necessary for completing the project. Costs for rock considerations must be incorporated in the line items of the bid scheduled. Pre-bid attendance is highly recommended for reviewing the site and geological terrain. Last day for questions will be February 6, 2020 at 3:00 PM and must be submitted to the buyer in writing. Online Q&A : no

Award

Roads / Highways

$1,325,256.00

Public - City

Paving, Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Asbestos Remediation
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Seeding
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
2
All Active Projects
2
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2020

April 13, 2020

img_map_placeholder

To Be Determined, Flagstaff, AZ


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sheep Crossing FUTS Trail

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.