BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Bozeman, Montana. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project consists of reconstructing Kagy Blvd from the intersection of S 19th to Willson including two travel lanes in each direction, turn lanes as needed, roundabouts at the intersections with S 11th S 7th, traffic signal upgrades at the intersection with Willson and 19th, a 10- foot shared-use path on both sides of the corridor, pedestrian tunnels at S 11th and to connect the Gallagator Trail, landscaping, and street lighting. City has applied for federal grants up to $24,512,000. If the grant is awarded to the City, additional local fund contributions will be capped. If not, project scope will need to be revisited, and Bozeman City Commission has previously agreed to fund the local contributions at $6,500,000 of Street Impact Fees. This project is identified in the 2017 Transportation Master Plan as MSN-8, SPOT-1, SPOT-6, SPOT-7, and SPOT-8. Engineering and Inspection: $6,546,000 Utilities: $1,306,000 Right of Way: $2,567,000 Construction: $20,221,000 Federal funds include STBDP funds totaling $4,440,000. State funds include $688,000. Local funds total $1,000,000 from Street Impact Fee funds already paid in a prior fiscal year This project is included in the city's fy 2025-2029 Capital Improvement Program. As of October 11, 2024, the project is designed by in-house design firm. Further detail regarding firm construction and completion timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Roads / Highways

$30,640,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
2
Bidding Soon
71
All Active Projects
32
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

img_map_placeholder

W Kagy Blvd, Bozeman, MT

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.