BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Salina, Kansas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work shall consist of the application of ultrathin bonded asphalt surface (UBAS) material to an existing street surface in accordance with the latest version of Section 613 of the Kansas Department of Transportation Standard Specifications (KDOT) and as herein. 2. MATERIALS A. Asphalt Binder. Asphalt Binder shall be Grade PG 70-28 asphalt cement as specified in the latest version of Section 1202 of the Standard Specifications. Material shall be sampled and sealed at the refinery or other point of loading, and an approved testing laboratory shall test samples. All sampling and testing shall be conducted in accordance with the applicable AASHTO or ASTM test method. Acceptance will be based on certified test reports, and copies of such reports shall be furnished for each shipment. Contractor shall arrange and pay for all testing, and shipment of materials shall be scheduled to permit sampling and testing in advance of time materials will be required on the work. Provide Emulsion Bonding Liquid (EBL) that complies with Section 1200 of the Standard Specifications. B. Reclaimed Asphalt Pavement (RAP) and Recycled Asphalt Shingles (RAS). Do not use RAP or RAS in the UBAS. C. Aggregates. Provide aggregates that comply with Section 1103 of the Standard Specifications. D. Combined Aggregates. Provide combined aggregates for Type B mix designation as shown in Table 613-1 of Section 613 of the Standard Specifications. 3. SURFACE PREPARATION Clean the surface to remove all foreign material and broom to remove dust. Apply bituminous tack coat. Material shall be Type SS-1H anionic or CSS-1H cationic asphalt emulsion as specified in Section 1203 of the KDOT Standard Specifications. Material shall be sampled and tested by an approved testing laboratory at the expense of the Contractor, as specified in Section 1203. Acceptance will be based on certified test results. Equipment and construction requirements shall conform to Section 606 of the Standard Specifications. Rate of application as directed by the Engineer shall be between 0.08 and 0.12 gallons per square yard. 4. MAINTENANCE OF TRAFFIC Closing of streets for this work shall be at the direction of the Engineer and coordinated to result in the least practicable delay and inconvenience to traffic. Unless otherwise directed, all roads shall have one lane of traffic open in each direction at all times. The lanes being sealed shall be closed and guarded until cured out and open to traffic. Sufficient flagmen, warning signs and barricades shall be provided by the Contractor to properly control traffic and to prevent traffic from traveling in the freshly applied materials. Barricades and barricading, signs and other warning devices will be in accordance with the Federal Highway Administration "Manual on Revised 1-5-2017 KRJ 220-2 Uniform Traffic Control Devices" provisions for "Traffic Controls for Street and Highway Construction and Maintenance Operations." 5. CURING Adequate means shall be provided to protect the UBAS from damage by traffic until the mixture has cured sufficiently so that it will not adhere to or be picked up by the tires of vehicles. The Contractor shall provide signs, barricades and flagmen necessary to control traffic around the area under construction. The Contractor shall repair any damage done by traffic to the UBAS at no expense to the City. 6. YIELDS Rates of application shall be as designated in the Summary of Quantities or as directed by the Engineer. The Engineer shall approve the mix design and all UBAS materials and methods prior to use. 7. WEATHER LIMITATIONS Do not place UBAS on any wet or frozen surface or when weather conditions prevent the proper handling and finishing of the mixture. Only place UBAS when either the ambient air temperature is 50 degrees Fahrenheit or the minimum road surface temperature is 55 degrees Fahrenheit. 8. MEASUREMENT AND PAYMENT Measurement shall be made based on dry tonnage of combined UBAS materials delivered and placed in accordance with specifications. Delivery tickets shall be required as documentation for payment. Payment for this work shall be made at the contract unit price per ton for UBAS at the locations as shown in the plans. Tack coat shall be at no direct payment. The City of Salina, Kansas, reserves the right to reject any or all proposals and to waive any irregularities therein.

Award

Roads / Highways

$632,872.00

Public - City

Paving, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
6
Bidding Soon
164
All Active Projects
70
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2020

March 16, 2020

img_map_placeholder

Multiple Locations, Salina, KS

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.