Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.
Bid Security Required - Bond, Certified Check, Cashier's Check, or Cash to accompany bid - 10% of Contractor's Base Bid. Time for completion - All work shall be completed by June 19, 2020. All work shall be continuous and the number of allowable work days shall be 60 work days. Liquidated Damages - $1000 The bidder's commitment for SBE participation on this project is 4 % The bidder's commitment for Resident Preference Program Participation on the project is 40 % Locations - N. 26th St. - W. Walnut St. to W. Vine St. Plan Files - 2020-056, 2020-058 Dated - 11/12/2019 Project ID - SM495160033 W. Walnut St. N. 26th St. to N. 27th St. Plan Files - 2020-057, 2020-058 Dated - 11/12/2019 Project ID - SM495160033 Item Code Description Quantity Units 48096 96' Dia. Combined Cured In Place Lining 1,060 Lin. Ft. 48396 Field Sample Test of Installed 96' Dia Cured-in-Place Lining 2 Each 50001 Barricading 1 Lump Sum 50015 Erosion Control 1 Lump Sum 50059 Re-establish Connection 32 Each 50076 Concrete Collar 2 Each 50300 Pavement Dowels 30 Each 50301 Pavement Sawing 60 Lin. Ft. 50307 3' Asphaltic Concrete 25 Sq. Yds. 50309 Concrete Base 25 Sq. Yds. 61012 Re-establish 12' Dia. Sewer Connection 1 Each 61018 Re-establish 18' Dia. Sewer Connection 1 Each 61030 Re-establish 30' Dia. Sewer Connection 1 Each 64001 Manhole Repair 2 Vert. Ft. 64400 Manhole Lining 69 Vert.Ft. 80003 Work Shaft 1 Each 80020 Accommodation Allowance 1 Lump Sum In submitting this bid, the bidder understands that the Commissioner of Public Works reserves the right to reject any and all bids. If written notice of the acceptance of the bid is mailed, telegraphed, or delivered to the undersigned within forty-five (45) days after the opening thereof, the undersigned agrees to execute and deliver the contract in the prescribed form (contract form on file in the office of the Commissioner of Public Works) and furnish the required performance and payment bonds, and to meet such insurance requirements as may be required, within ten days after the receipt of the official notice of award. All Contractors awarded a contract valued at $25,000.00 or more are required to participate in training on the City of Milwaukee's B2GNow contract compliance software. Contractors must complete the training no later than 30 days after the date of contract award. Throughout the contract term, Contractors are required to regularly provide timely payment information in the City's contract compliance software. Please contact the Office of Small Business Development (OSBD) at 414-286-5553 should you have any questions or concerns regarding the training or reporting process. In submitting this bid, the bidder understands that the Commissioner of Public Works reserves the right to reject any and all bids. If written notice of the acceptance of the bid is mailed, telegraphed, or delivered to the undersigned within forty-five (45) days after the opening thereof, the undersigned agrees to execute and deliver the contract in the prescribed form (contract form on file in the office of the Commissioner of Public Works) and furnish the required performance and payment bonds, and to meet such insurance requirements as may be required, within ten days after the receipt of the official notice of award
Award
Water / Sewer
$1,214,250.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 30, 2020
March 2, 2020
Multiple Locations, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: Dec 04 2019
Milwaukee, WI
Bid Date: Dec 03 2020
Milwaukee, WI
Bid Date: Aug 02 2023
Milwaukee, WI
Bid Date: Aug 08 2023
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Feb 27 2024
Milwaukee, WI
Bid Date: Aug 18 2023
Milwaukee, WI
Bid Date: May 28 2020
Milwaukee, WI
Bid Date: Aug 08 2023
Milwaukee, WI
Bid Date: Aug 02 2023
Milwaukee, WI
Bid Date: Aug 08 2023
Milwaukee, WI
Bid Date: Jul 31 2023
Milwaukee, WI
Bid Date: Jul 31 2023
Milwaukee, WI
Bid Date: Jul 26 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.