BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Soap Lake, Washington. Completed plans call for site work for a water / sewer project.

This Contract provides for the replacement of water and sewer infrastructure throughout the City in accordance with the Contract Documents. Work shall include, but not be limited to, the following: A. Installation of approximately 13,900 lineal feet, of new 6-inch to 12-inch diameter sewer pipelines throughout the City, including replacement; of existing manholes and reconnection of existing side sewers. Existing sewers will be replaced by open-cut, pipe bursting, or cured-in-place pipe methods B. Installation of approximately 5,200 lineal feet of new 8-inch diameter water main, including valves, fittings, hydrants, thrust blocks, services, service piping and all other appurtenances required to complete the work. C. Install an AMR water metering system, including furnishing and installing water meters, registers, and meter transmitter units at the locations shown in the Plans, providing documentation and pictures of each water meter installation, replacing water meter boxes and setters at the locations shown in the Plans, furnishing and installing hardware and software for the supplied AMR system, along with, startup, testing, and operator training. D. Replacement of the source meters for the City's wells with magnetic flow meters, including pipe, fittings, and all other appur tenances required to complete the work. E. Replacement of approximately 28 fire hydrants, including valves, fittings, thrust blocks, and all other appurtenances required to complete the work. F. Restoration of all surfaces disturbed by construction activities, including bid not limited to, concrete curbs, gutters, driveways, sidewalks, gravel, landscaping, fencing, and HMA pavements. G. Provide testing, commissioning, and training as specified herein. H. All associated work as shown in the Contract Documents, for complete and workable system. The Work shall he substantially complete within 155 working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Documents for this project a nd any addenda issued thereto that are on file at the office of the City of Soap Lake, City Hall, 239 Second Avenue SE, Soap Lake, Washington 98851. The Bids will be publicly opened and read aloud shortly after the time and date stated above. Bids are to be submitted only on the form provided with the Bidding Documents. All Bids must be accompanied by a certified check, money order, or bid bond payable to the "City of Soap Lake" and in an amount of not less than five percent (5%) of the total amount bid. Section 746 of Title VII of the Consolidated Appropriations Act of 20.17 (Division A. - Agriculture, Rural Development, Food and Drug Administration, and Related. Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel, requirement to this project. All listed iron and steel products used in this project must be produced in the LTnited States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. The deminimis and minor components waiver apply to this contract. Financing for the Project has been provided by the United States Department of Agriculture Rural Development and the City of Soap Lake. The City of Soap Lake expressly reserves the right to reject any or all bids and to waive minor irregularities or informalities and to award the Work to the responsible Bidder submitting the lowest responsive, responsible Bid for whichever schedules as best serves the interests of the Owner. Only one alternate for Schedule C will be awarded. The Owner will determine at the time of award which schedules and alternate will be awarded.

Award

Water / Sewer

$4,075,059.00

Public - City

Site Work

93

1

2

6

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
14
Bidding Soon
367
All Active Projects
106
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 13, 2020

March 30, 2020

August 18, 2020

img_map_placeholder

Multiple Locations, Soap Lake, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.