BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation and addition to a mixed-use development in Barrington, Illinois. Completed plans call for the renovation of a educational facility; and for the addition of a educational facility.

**As of January 19, 2022 , the project has not been started . A timeline for the start dates have not yet established.** *. Information on the project including a timeline is at https://www.barrington220.org/build220.* 2020 Bond - Barrington Community Unit School District 220 The district is seeking authority to issue $147 million in school building bonds to cover three areas: 1. Safety and Security Improvements which will include: - Eliminate mobile classrooms at BMS-Prairie Campus, BMS-Station Campus, and Grove Avenue Elementary School - Enhance exterior building security at all schools - Upgrade safety in interior classrooms and hallways at all schools, which includes replacing analog security cameras with a digital system - Improve traffic circulation at pick-up/drop-off zones at Barrington High School - Add bollards and safety barriers in pick-up/drop-off zones at all schools - Renovate front entrance at Grove Avenue Elementary School - Upgrade fire alarm system at Sunny Hill Elementary School 2. Learning Environment Modernization which will include: - Build additional classroom space at all elementary schools to be used for STEM (Science, Technology, Engineering, Math) instruction and students with special needs - Modernize learning environments at all schools - Build addition at Barrington High School with additional classroom space, cafeteria improvements, and a new student services area providing counseling, attendance, health services, and dean’s office in an easily accessible central location - Build additional classroom spaces at both middle schools - Build physical education and wellness addition, renovate Field of Dreams and varsity baseball field, and replace and relocate tennis courts at Barrington High School - Create architectural design work for a fine arts facility at Barrington High School (to allow for collaborative discussions with the community on a potential fine arts center in the future) 3. Infrastructure and Life Safety Upgrades which will include: - Repair and renovate all schools, including: Heating, Air Conditioning, Electrical, Plumbing, Roofs, Doors, Windows, Masonry, Mechanical Systems, Kitchen Equipment - Install back-up generators at all schools - Make all entrances and exits at Barrington High School, Arnett C. Lines Elementary School, and Sunny Hill Elementary School ADA compliant - Upgrade restrooms and make them ADA compliant at all schools - Install new theatrical stage lighting in Barrington Middle School–Station Campus cafeteria - Remove septic and well water systems and replace with city water/sewer at Barbara B. Rose Elementary School - Make all stairs, gates, and exits ADA compliant at Arnett C. Lines Elementary School - Install handicap accessible ramp to front entrance at Hough Street Elementary - Replace elevator to make it ADA compliant at Grove Avenue Elementary School - Improve temperature control at Barrington Early Learning Center - Replace phone systems with new digital systems at all schools - Install new playground equipment at Sunny Hill Elementary School Voters last April rejected a request to borrow $185 million for facility upgrades. As of February 15, 2021, all subcontracts have been let and awarded. Project is scheduled to start this coming Summer, 2021, and will be completed after 3 years.

Award

Educational

$147,000,000.00

Public - County

Addition, Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
105
Bidding Soon
2,147
All Active Projects
920
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2022

img_map_placeholder

Multiple Locations, Barrington, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.