BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

This is a service / maintenance or supply contract in Leander, Texas. Contact the soliciting agency for additional information.

As of December 29, 2021, the owner has announced an award for this solicitation. Closed solicitation has been included below for reference. ........... The City of Leander is poised to make major investments for raw water supplies with the construction of the Brushy Creek Regional Utility Authority (BCRUA) Deep Water Intake on the main channel of the Colorado River in Lake Travis in order to supply raw water to the Leander Sandy Creek Water Treatment Plant and the BCRUA Water Treatment Plant. The City of Leander previously relied on Round Rock's 2005 study titled Lake Travis Raw Water Supply and its recommendation of securing long range water supplies from Lake Travis as the most cost-effective means of securing adequate water supplies for the ultimate build-out of Leander. Due to the age of that study, improvements in technology, development of large groundwater supply districts, etc., the City of Leander seeks the services of a qualified engineering firm to provide professional services for an updated water supply study as the basis for determining the most cost-effective method(s) of securing water supply(s) for Leander's full development and build-out. Additionally, the selected qualified engineering firm will provide professional services to comply with U.S. Senate Bill 3021, America's Water Infrastructure Act of 2018 (AWIA). The general scope includes a comprehensive assessment (Assessment) of the risks to, and the resilience of, the City of Leander's drinking water system, and development of an Emergency Response Plan (ERP) that incorporates the findings of the Assessment, in compliance with all requirements of the AWIA. The U.S. Environmental Protection Agency (U.S. EPA) requires certification of the completion of the Assessment by December 31, 2020, and of the ERP by June 30, 2021. The method of contractor selection has not been determined at this time. *This project is on hold due to the public health crisis. A new timeline has not been established. As of June 25, 2020, this project is under evaluation. A design firm has not been selected yet.

Award

Water / Sewer

$1,000,000.00

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
43
Bidding Soon
2,219
All Active Projects
742
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.