BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in San Antonio, Texas. Completed plans call for the renovation of a educational facility.

As of February 24, 2020, project will not be awarded until March 24, 2020. Subcontractors and suppliers may obtain up to one (1) electronic set (CD) of Proposal Documents from the office of the Architect/Engineer upon receipt by Architect/Engineer of a deposit, in the form of cash or a check, payable to Architect/Engineer in the amount of $0.00 for each set which shall be refundable provided the subcontractor or supplier submits a valid proposal and also provided that the Contract Documents are returned to the Architect/Engineer in good condition within ten (10) days after the date of receipt of proposals. Additional sets may be purchased from the Architect/Engineer by General Contractor, subcontractor or supplier at the cost of $10.00 per CD. All payments shall be made payable to the order of (Architect/Engineer name). No partial sets of bid documents will be issued, and the Owner and/or Architect/Engineer will have no responsibility for errors or misinterpretations resulting from the use of incomplete sets of documents. If the Proposal Documents are timely returned but in poor condition, a reasonable amount for the cost of reproduction will be deducted from the amount of deposit and the remaining balance will refunded to the General Contractor, subcontractor or supplier. If the Proposal Documents are not timely returned to Architect/Engineer, or if a proposal is not submitted, the deposit will be forfeited. The Project is generally described as follows: Install new fire sprinkler system for the facility integrating into existing system; install new and replace existing HVAC equipment for MDF/IDF rooms. Work shall be completed as indicated on the drawings and specifications to include all general construction, site work, heating, air conditioning, electrical, plumbing, fire protection, and all other work as indicated on the construction documents. The Project must be complete and ready for occupancy not later than August 14, 2020 assuming that the successful Offeror is given notice of its top ranking on or before February 26, 2020. Any proposal must provide for final completion by this date. The Notice to Proceed may be issued up to forty-five (45) consecutive calendar days following the Notice of Award. The Contractor shall take this period into account in the preparation of its Proposal. No claim for additional time shall be considered unless this period is exceeded

Award

Educational

$624,950.00

Public - City

Renovation

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
41
Bidding Soon
2,169
All Active Projects
804
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2020

March 23, 2020

img_map_placeholder

9500 Timber Path, San Antonio, TX

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.