BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Maplewood, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

Construction of the following project within the city limits on the basis of payment for the work: Maplewood, Minnesota Gervais Area Pavement Rehabilitation, City Project 21-07. The project will include the following approximate quantities: 11,000 TON Bituminous Base, Binder & Wear Course Mixture 5,500 LF Bituminous Road Pavement Saw & Seal/Joint Adhesive 42,000 SY Full Depth Reclamation 6,600 SY Bituminous Pavement Milling 5,600 LF Concrete Curb and Gutter 500 SY Commercial & Residential Concrete Driveway 500 SY Commercial & Residential Bituminous Driveway 5,100 SF Concrete Sidewalk 3,000 SY Turf Establishment 22,000 LF Pavement Striping (Epoxy Multi-Component) 100 LF Storm Sewer Pipe 4 EA Storm Sewer Structures 69 EA Furnish & Install/Adjust Storm Sewer Castings 43 EA Furnish & Install/Adjust Existing Sanitary Sewer Castings 2,400 LF Water Main Installation - DIP (Open Trench) & HDPE (Pipe Bursting). ll bids must be accompanied by a certified check or bid bond, payable to the City of Maplewood, Minnesota, in an amount equal to five percent (5%) of the total bid, conditioned that if the bidder is the successful bidder, they will enter into a contract in accordance with said bid and will furnish such performance bonds as are specified. No bidder may withdraw their bid for at least 90 days after the scheduled closing time for the receipt of bids, without the consent of the owner. The City of Maplewood reserves the right to reject any or all bids. The City of Maplewood also reserves the right to waive any minor irregularities and deviations; however, any bid which contains a material variance from plans and specifications will be rejected. A material variance is one that gives a bidder a substantial benefit or advantage not enjoyed by other bidders. Andrea Sindt City Clerk City of Maplewood, Minnesota

Bid Results

Roads / Highways

$2,885,675.00

Public - City

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
64
Bidding Soon
1,727
All Active Projects
602
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 13, 2022

May 30, 2022

November 11, 2022

img_map_placeholder

Gervais Ave, Maplewood, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.