BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 12, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a mixed-use development in West Palm Beach, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The project is the construction of a 10-foot-wide multi-use trail on the west side of Clear Lake, as well as boardwalk over the perimeter of Clear Lake, the Citys drinking water reservoir. The proposed trail and boardwalk will connect to an existing trail just south of Palm Beach Lakes Boulevard to Okeechobee Boulevard near the ramp for Interstate 95 Final Questions Due: April 27, 2022 at 3:00p.m. Please email questions to mwatson@wpb.org or call 561-822-2031 for assistance.

Post-Bid

Sidewalks / Parking Lot

$600,000.00

Public - City

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
292
Active Projects
139
Bidding Soon
1,883
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2022

June 13, 2022

Project location map

To Be Determined, West Palm Beach, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.