BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Bronx, New York. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Contract was awarded to El Sol/DeFoe JV . The contract award amount was $518,007,901.77 The start date for this contract was March 3, 2021. This estimated value of this contract is forecasted to be between $550 - $650 million. The work envisioned for this project will include: Bruckner Expressway: Removal of the Exit 48 Ramp RE from Westbound Bruckner Expressway to 138th Street Construction of two (2) new ramps: Ramp LB from Leggett Avenue to Westbound Bruckner Expressway Ramp BL from Westbound Bruckner Expressway to Leggett Avenue Widening of the Bruckner Expressway from Barretto Street to proposed Ramp BL to accommodate additional lanes. Bruckner Expressway Viaduct: Rehabilitation from East 141st Street to Barretto Street (1.25 miles), including deck replacement and improvements to existing piers. Bruckner Boulevard: The Project will consist of providing improved access between Hunts Point Peninsula and the Bruckner Expressway, and addresses structural and operational deficiencies of the existing infrastructure. The project will improve pedestrian safety through intersection redesign and improvements to the shared use path and bicycle lanes along Bruckner Boulevard. The project also includes utility replacement and relocation in the vicinity of the project site. Pavement rehabilitation from 138th Street to Barretto Street Redesign of local street intersections with wider medians and shorter crosswalks to improve pedestrian safety. Construction of a shared-use path along the Bruckner Boulevard median between 138th Street and Barretto Street. Service-Disabled Veteran-Owned Set Aside: No Total MWBE Participation Goals: 14% Service-Disabled Veteran-Owned Business Contracting Goal: 0% Disadvantaged Owned Sub-Contracting Goal: 14% Final date for receipt of Proposer questions : October 9, 2020 Issue Date for Final Addendum and/or answers to Proposer questions : October 21, 2020 Post Proposal meetings (if required) : November 18-19 Selection of Best Value : December 10, 2020 Contract Award : March 4, 2021 Notice to Proceed : March 4, 2021

Award

Roads / Highways

$518,007,902.00

Public - State/Provincial

Paving, Site Work

406

55

107

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
461
Active Projects
235
Bidding Soon
4,567
All Active Projects
2,040
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2020

March 3, 2021

img_map_placeholder

Multiple Locations, Bronx, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.