BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Sun Prairie, Wisconsin. Completed plans call for site work for a water / sewer project.

*This project was originally scheduled to bid on April 1, 2020. Project includes mass grading of a 57.6-acre site, located along S Thompson Rd, south of Main St, in the City of Sun Prairie, Dane County, Wisconsin (52.2-acres of this mass grading project is located at the southwest quadrant of Main St / S Thompson Rd intersection and 5.39-acres of this mass grading project is located at the southeast quadrant of the Main St / S Thompson Rd intersection). Mass grading includes grading of one regional detention pond (11.6-acres), one regional dry pond (5.4-acres), and the remaining developable land. Project also includes installation of 488-LF 60-Inch RCP Storm Sewer, 3-EA 120-Inch Concrete Storm Manholes, 1,232-LF 21-Inch Sanitary Sewer Interceptor, 4-EA 60-Inch Sanitary Sewer Manholes, in addition to approximately 720-LF RCP Storm Sewer, ranging from 12-Inch to 42-Inch. Dewatering will be required. The successful bidder shall be required to conform to all Federal and State OSHA requirements as well as to the extent necessary to comply with all Davis-Bacon and/or Wisconsin Prevailing Wage laws. The City of Sun Prairie reserves the right to reject any or all bids or to waive any informality in the bidding process. Bids may be held by the City of Sun Prairie for a period not to exceed sixty (60) days from the bid opening of the bids for the purpose of reviewing the bids and investigating the qualifications of the bidders, prior to awarding of the Contract. We will only be accepting electronic bids. To access the electronic bid form, download the project documents electronically. For electronic bids, electronic bid bonds are required. For your convenience, plans and bidding documents will be available electronically. When plans are ready, you will be able to view, download or print them electronically. *This project is on hold due to the public health crisis. A new timeline has not been established.

Award

Water / Sewer

$2,521,643.00

Public - City

Site Work

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

5

Subscribe For Documents

101 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
54
Bidding Soon
1,103
All Active Projects
488
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2020

June 22, 2020

img_map_placeholder

N Thompson Rd, Sun Prairie, WI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.