BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2020 at 8:00 PM

Updated September 14, 2023

Site work and paving for a road / highway in Norco, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Contract Documents, Specifications and Plans for the above stated project. The general items of work to be done hereunder consist of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consists of a 1 1/2" mill and overlay on Hamner Avenue from Hidden Valley Parkway to Third Street, the installation of a video detection system at Hamner Avenue and Second Street, and all appurtenant related work to the satisfaction and acceptance of the City Engineer. There are 20 working days allowed to complete this project, including any and all alternatives. Liquidated damages shall be assessed at $500.00 per working day. The Contract Documents call for monthly progress payments based upon the engineer's estimate of the items of work completed. The AGENCY will retain 5 percent of each progress payment as security for completion of the balance of the work. A

Award

Roads / Highways

$662,312.00

Public - City

Paving, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
550
Active Projects
282
Bidding Soon
3,814
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2020

April 3, 2020

Project location map

Hamner Ave, Norco, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.