BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Saint Joseph, Missouri. Completed plans call for the renovation of a residential development.

Project has been awarded to Superior Exteriors and REA Contracting: Superior Exteriors 509 Monroe Street - $15,728 2017 Pacific Street - $31,184 REA Contracting 3141 Edmond Street - $5,000 2901 Penn Street - $12,580 220 W. Hyde Park Avenue - $25,950 Proposals for: (C. D. Rehabs) 2811 Olive Street, 1915 North 4th Street, 2622 South 18th Street, 1321 Faraon Street, and 501 East Highland Avenue No bid bond is required Liquidated damages in the amount of $100.00 per day will be assessed on all projects where the completion of work extends beyond the contract expiration date. Upon receiving more than one sealed bid the rehab specialists will disclose their cost estimate. Bidder whose bid is not within fifteen percent (15%) (high or low) of the rehab specialists' estimate may withdraw his/her bid at the bid opening without penalty. Acceptance and rejection of bids: the department of community development reserves the right to reject any and all bids which fail to comply with any provision of the specifications. Thereafter, (for loans), the rehab specialist will forward all acceptable bids to the homeowner(s) for his/her review and selection, and the homeowner(s) will be notified of the rehab specialists' estimate. If there is more than a fifteen percent (15%) difference between the homeowner's selected bid and the rehab specialists' estimate, the rehab specialist may request a cost analysis of any bidder outside the fifteen percent (15%) range, requiring line item bids with quantities (e. G. 16 squares of shingles). Bidders who fail to provide information requested for a review and cost analysis will not be awarded a contract and will not be eligible to bid on community development funded projects for a period of ninety (90) days. A bidder who is within fifteen percent (15%) of the rehab specialists' estimate, yet withdraws his/her bid, will not be eligible to bid on community development funded projects for a period of ninety (90) days. The executed contract must be returned to the community development office within ten (10) days of receipt of the contract by the contractor. These projects are being funded one-hundred percent (100%) with federal dollars through the community development department of st. Joseph, Missouri. Bid Results: 2811 Olive Street Superior Exteriors-$ 62355 1915 North 4th Street Superior Exteriors-$39190 2622 South 18th Street Superior Exteriors-$29142 1321 Faraon Street Superior Exteriors-$5928 501 East Highland Avenue REA Contracting-$9750

Award

Residential Subdivision

$90,442.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
34
Bidding Soon
733
All Active Projects
322
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2020

March 30, 2020

img_map_placeholder

Multiple Locations, Saint Joseph, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.