Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a mixed-use development in Morrisville, Pennsylvania. Working plans call for the renovation of a swimming pool; and for site work for a swimming pool.
**As of July 23, 2020 contract for this project has been cancelled. As of this time it is unknown if and when project will rebid. Lower Makefield Township is accepting proposals for pool painting. Lower Makefield Township is seeking quotes to acid wash and paint its four pools. The four pools include its Olympic swimming pool, Lap swimming pool, Intermediate swimming pool and Tot pool Olympic Pool Dimensions o The main swimming pool ofthe facility has a basic "ell" shape; including a 50-meter long course and a 25-meter short course. o Structure measures 164'4" x 45' plus a diving well of 60' x 37'4". o Water surface area - approximately 9,500 square feet. o Water Volume - approximately 451,066 gallons. o Total Volume - approximately 60,303 cubic feet. Painting One coat, one color - commercial base. Paint prep - clean, scrape, etc. SauSea Eco-Choice natural rubber base, chlorinated paint per gallon (lifespan 1-3 years) Qty. 84 gallons Color: Cerulean White 50-meter lines with cross targets. SauSea Eco-Choice natural rubber base, chlorinated paint per gallon, Qty. 10 gallons Color: Dark Blue 25-meter lines with cross targets. SauSea Eco-Choice natural rubber base, chlorinated paint per gallon, Qty. 8 gallons Color: Black Intermediate Pool Dimensions o A rectangular swimming pool. o Structure measures 45' x 60'. o Water surface area - approximately 2,675 square feet. o Water Volume - approximately 64,575 gallons. o Total Volume - approximately 8,633 cubic feet. Painting o One coat, one color - commercial base. o SauSea Eco-Choice natural rubber base, chlorinated paint per gallon (lifespan 1-3 years) o Qty. 23 gallons o Color: Cerulean White Lap Pool Dimensions o 25-meter by 25-yard pool. o Structure measures 75' 1" x 82' 1". o Water surface area - approximately 6,173 square feet. o Water Volume - approximately 205,325 gallons. o Total Volume - approximately 27,450 cubic feet. Painting One coat, one color - commercial base. SauSea Eco-Choice natural rubber base, chlorinated paint per gallon (lifespan 1-3 years) o Qty. 36 gallons o Color: Cerulean White Target Painting o SauSea Eco-Choice natural rubber base, chlorinated paint per gallon, o Color: Dark Blue Line Painting o SauSea Eco-Choice natural rubber base, chlorinated paint per gallon, o Color: Black Baby Pool Dimensions o Structure measures 3 5 ' x 3 5 '. o Water surface area - approximately 1,175 square feet. o Water Volume - approximately 4,205 gallons. o Total Volume - approximately 562 cubic feet. Painting o One coat, one color - commercial base. o SauSea Eco-Choice natural rubber base, chlorinated paint per gallon (lifespan 1-3 years) o Qty. 6 gallons o Color: Cerulean White
Final Planning
Swimming Pools
$40,000.00
Public - City
Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 24, 2020
January 23, 2021
To Be Determined, Morrisville, PA
Related To This Project
Morrisville, PA
--
Morrisville, PA
Bid Date: Feb 28 2023
Morrisville, PA
--
Morrisville, PA
--
Morrisville, PA
Bid Date: May 12 2023
Morrisville, PA
Bid Date: Jul 14 2023
Morrisville, PA
--
Morrisville, PA
Bid Date: Jul 03 2023
Morrisville, PA
--
Morrisville, PA
Bid Date: Aug 29 2022
Morrisville, PA
--
Morrisville, PA
Bid Date: Jan 22 2021
Morrisville, PA
Bid Date: Jul 14 2022
Morrisville, PA
Bid Date: Jul 14 2022
Morrisville, PA
Bid Date: Jun 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.