BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Fayetteville, Georgia. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.

As of Sept 7 the project was awarded to Piedmont Paving Inc for $3,967,499.09. The primary purpose of the project is to provide a connection between SR 54 and Lester Road through the implementation of a multi-modal trail for pedestrians and cyclists. The project is also to promote health and wellness of the general public through multi-modal transportation facilities and connectivity to key land uses in the City of Fayetteville. This project originated from Fayette County's application for Transportation Alternative Program (TAP) funding. The pedestrian bridge will be located approximately one quarter mile to the west of Piedmont Fayette Hospital and the intersection of Togwatee Village Parkway at SR 54. The pedestrian bridge will connect at grade with the future proposed multi-use trail along SR 54 which will connect to the existing network of multi-use trails in Fayetteville and the unincorporated County. The path will be open 24 hours a day and seven days a week. The proposed facility will be monitored by the City of Fayetteville Police Department. Maintenance of the multi-use path and pedestrian bridge will be provided by the City of Fayetteville. Bid questions should be submitted in writing to Sherry White, Contract Administrator via e-mail at: swhite@fayettecountyga.gov.Questions will be accepted until 2:00pm Friday, May 28, 2021. Bid Bond: You must include a bid bond with your bid, equal to five percent (5%) of the total amount bid. Bid bonds shall be provided by a surety which appears on Georgia's list of approved sureties administered by the State Insurance Commissioner, or the U.S. Treasury's list of approved bond sureties (Circular 570). Performance and Payment Bonds: Prior to execution of a contract, the successful bidder shall submit performance bond equal to 100 percent of the contract amount, and payment bond equal to 110 percent of the contract amount, provided by a surety which appears on Georgia's list of approved sureties administered by the State Insurance Commissioner, or the U.S. Treasury's list of approved bond sureties (Circular 570).

Award

Roads / Highways

$3,967,499.00

Public - County

Paving, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
50
Bidding Soon
1,536
All Active Projects
586
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2021

August 9, 2021

img_map_placeholder

GA-54, Fayetteville, GA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.