BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in San Diego, California. Completed plans call for site work for a water / sewer project.

LICENSE REQUIREMENT: To be eligible for award of this contract, Prime contractor must possess the following licensing classification: A PREVAILING WAGE RATES APPLY TO THIS CONTRACT: Refer to Attachment D. ADDITIONAL LICENSE REQUIREMENTS: Tunneling work shall be performed by a C-34 Licensed (sub)contractor registered by the California Contractor's State License Board. Dewatering work shall be performed by a C-57 Licensed (sub)contractor registered by the California Contractor's State License Board. SUBCONTRACTING PARTICIPATION PERCENTAGES: Subcontracting participation percentages apply to this contract. The City has incorporated mandatory SLBE-ELBE subcontractor participation percentages to enhance competition and maximize subcontracting opportunities. For the purpose of achieving the mandatory subcontractor participation percentages, a recommended breakdown of the SLBE and ELBE subcontractor participation percentages based upon certified SLBE and ELBE firms has also been provided to achieve the mandatory subcontractor participation percentages: 1. SLBE participation 5.6% 2. ELBE participation 9.4% 3. Total mandatory participation 15.0% The Award of this contract is contingent upon the Contractor's compliance with all conditions of Award as stated within these documents and within the Notice of Intent to Award. Upon acceptance of bids and determination of the apparent low bidder, the City will prepare the contract documents for execution within approximately 21 days of the date of the bid opening. The City will then award the contract upon receipt of properly signed Contract, bonds, and insurance documents. This contract will be deemed executed and effective only upon the signing of the Contract by the Mayor or his designee and approval as to form by the City Attorney's Office. The low Bid will be determined by the Base Bid. Once the low bid has been determined, the City may, at its sole discretion, award the contract for the Base Bid alone. The Director (or Designee) of the Purchasing & Contracting Department is the officer responsible for opening, examining, and evaluating the competitive Bids submitted to the City for the acquisition, construction and completion of any public improvement except when otherwise set forth in these documents. Any questions related to this solicitation shall be submitted to: JEEspindola@sandiego.govQuestions received less than 14 days prior to the date for opening of Bids may not be considered. Construction of the Harbor Drive Trunk Sewer Replacement Project consists of replacement of 1,044.93 LF of existing 12 inch ESVCP with 18 inch PVC Sewer Main, 279.18 LF of 12 inch ESPVC with 20 inch FPVC and 21 inch PVC under BNSF and MTS Right-ofWay using trenchless methods, 3,175.67 LF of 15 through 24 inch Techite Pipe with 30 inch FPVC inside a 54 inch steel casing using trenchless methods and all other work and appurtenances in Contract Specifications CONTRACT TIME: The Contract Time for completion of the Work shall be 370 Working Days.

Bid Results

Water / Sewer

$30,987,399.00

Public - City

Site Work

47

8

13

5

Subscribe For Documents

245 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
250
Active Projects
127
Bidding Soon
1,449
All Active Projects
704
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 1, 2022

August 1, 2022

December 11, 2023

img_map_placeholder

N Harbor Dr, San Diego, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.