BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Minneapolis, Minnesota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Bikeway improvements along Hennepin Avenue (CSAH 52) and 1st Avenue (CSAH 52) from Main Street SE (CSAH 23) to 8th Street SE in the City of Minneapolis. Hennepin Avenue (CSAH 52) and 1st Avenue (CSAH 52) serve as one-way pairs in this area east of the Mississippi River. Each roadway includes sidewalk on both sides, three vehicle lanes, and many locations where on-street parking is permitted. Bikeway facilities currently exist along these corridors to the west, however, they terminate at Main Street SE (CSAH 23). Additionally, bikeway facilities were introduced along Hennepin Avenue (CSAH 52) to the east of this project (from 8th Street NE to I-35W) as part of a paving project in 2020. The City of Minneapolis conducted a corridor study in 2016 along Hennepin Avenue (CSAH 52) and 1st Avenue (CSAH 52) that evaluated concepts to provide bicycle accommodations. This project is directly related that study. The proposed project includes the introduction of a bikeway along both Hennepin Avenue and 1st Avenue (CSAH 52). Available space within the existing roadway environment will be reallocated to provide the necessary space for a bikeway. It is anticipated that durable, high-visibility pavement markings will be used for lane designations to clearly define space for each user; this is especially important as traditional pavement marking methods (latex or epoxy materials) do not provide adequate visual contrast on the concrete roadway surface. Staff anticipates the following elements will be included with the project: catch basin upgrades, signing modifications, traffic signal replacements, and pedestrian improvements (ADA upgrades and curb extensions). Once completed, this project would connect users from Downtown Minneapolis to Northeast Minneapolis (via the Hennepin Avenue Bridge). This project will be coordinated with Metro Transit's E Line Bus Rapid Transit (BRT) Project that will operate along Hennepin Avenue (CSAH 52). This project will improve first/last mile connections for people biking and walking to the nearby BRT station. As of February 15, 2022, this project is currently in the FY 2022-2026 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$8,750,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
86
Bidding Soon
784
All Active Projects
326
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2023

img_map_placeholder

Hennepin Ave & 1st Ave NE, Minneapolis, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.