Site work and new construction of a water / sewer project in Cleveland, Ohio. Completed plans call civil work for a water / sewer project.

The Southerly Tunnel (SOT) and Consolidation (SOTC) project is a primary component of Control Measure #21 of the District's Consent Decree and includes the construction of a 23-foot diameter storage tunnel constructed in soil and extending approximately 18,000 feet in length, as well as two consolidation sewer systems that will connect to SOT, the Burke Brook and Morgana Run consolidation sewers. The SOT system will be dewatered by the Southerly Tunnel Dewatering Pump Station (STDPS), designed under a separate project, to send stored wet weather flows to the SWWTP. As of April 29, 2024 general contractor received notice to proceed. Construction completion scheduled for January 28, 2028. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. In general, the work shall consist of furnishing all labor, materials, equipment, and incidentals for construction of the following work: Approximately 18,060 LF of 23-ft (finished) diameter combined sewer overflow storage tunnel, excavated in soft ground and supported with a bolted, gasketed, one-pass steel fiber-reinforced precast concrete segmental lining. Four deep tunnel shafts, one dewatering drop shaft, diversion structures, combined diversion gate and screening structures, trenchless and open-cut consolidation sewers, miscellaneous modifications of existing regulator structures, and rehabilitation of existing sewers. For a more detailed description of project scope, please refer to the Contract Drawings, Specification Section 01 11 00 - Summary of Work, and the rest of the Contract Documents. All questions regarding the Contract Documents shall be directed to the Project Manager for the NEORSD, Charles Huse at husec@neorsd.org. The deadline for questions is Wednesday, November 15, 2023, at 5 P.M. Official Local Time. NEORSD MBE/WBE Program: 10% MBE/WBE NEORSD SBE Program: 5% SBE Ohio EPA WPCLF Program: 1.3% MBE and 1.0% WBE

Under Construction

Water / Sewer

$328,027,000.00

Public - County

New Construction, Site Work

3679

74

32

11

Subscribe For Documents

158 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
141
Bidding Soon
2,475
All Active Projects
1,053
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 14, 2023

April 29, 2024

January 28, 2028

img_map_placeholder

To Be Determined, Cleveland, OH


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.