Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a mixed-use development in Chauvin, Louisiana. Design plans call for the construction of a educational facility; for site work for a educational facility; pre-engineered storage facility; pre-engineered storage facility; office development; and office development.
As of May 3, 2022, this project is in design. Timelines for bidding and construction have not yet been established. *The previous solicitation is listed below for reference. ---- Applications shall be submitted on the standard LSB - 1 (September 2019 edition) only, with no additional pages attached. Please be sure to use an up-to-date copy of the form,Do not attach any additional pages to this application. Applications with attachments in addition to the pre-numbered sheets or otherwise not following this format will be discarded. One fully completed signed copy of each application shall be submitted. The copy may be printed and mailed or printed and delivered or scanned in PDF format and e-mailed. Printed submittals shall not be bound or stapled. E-mailed PDF copies, as well as printed copies, shall be received by Facility Planning & Control within the deadline stated above. The date and time the e-mail is received in the Microsoft Outlook Inbox at Facility Planning & Control shall govern compliance with the deadline for e-mailed applications. Timely delivery by whatever means is strictly the responsibility of the applicant. By e-mailing an application the applicant assumes full responsibility for timely electronic delivery. DO NOT submit both printed and e-mail copies. Any application submitted by both means will be discarded. 2. New Office/ Warehouse Building and Bulkhead, LUMCON Houma Marine Campus Phase 2, Houma, Louisiana, Project No. 19-674-19-01, WBS F.19002314. This project consists of a new 31,500 (+/-) sf building consisting of warehouse space with shop area and lab (approximately 22,856 sf), control room and two offices (approximately 2,683 sf), men's and women's restrooms, mechanical equipment rooms, along with circulation spaces. Also included is approximately 1,315 (+/-) linear feet of bulkhead along the adjacent navigable waterway, and a 30 ft wide concrete boat launch. Design will include foundation for 400 linear feet of track for overhead crane, and associated site paving and site improvements. The Designer shall prepare and submit all required drawings to Facility Planning and Control in AutoCAD and hard copy. Drawings shall follow the format specified in the "Instructions to Designers for AutoCAD Drawings Submittal". The funds available for construction are approximately $9,467,020.00 with a fee of approximately $700,302.00. Contract design time is 360 consecutive calendar days; including 105 days review time. Thereafter, liquidated damages in the amount of $400.00 per day will be assessed. Further information is available from Mark Bradley, Facility Planning and Control, mark.bradley@la.gov (504) 568-8545 Further information is available from Ernesto Egoavil, Facility Planning and Control, ernesto.egoavil@la.gov (225)342-3378 Applicants are advised that design time ends when the Documents are "complete, coordinated and ready for bid" as stated in to Article 3.3.1 (4) of the Capital Improvements Projects Procedure Manual for Design and Construction. Documents will be considered to be "complete, coordinated and ready for bid" only if the advertisement for bid can be issued with no further corrections to the Documents. Design time will not necessarily end at the receipt of the initial Construction Documents Phase submittal by Facility Planning and Control. Any re-submittals required to complete the documents will be included in the design time. In addition to the statutory requirements, professional liability insurance covering the work involved will be required in an amount specified in the following schedule. This will be required at the time the designer's contract is signed. Proof of coverage will be required at that time. Construction Cost $0 to $10,000,000 Limit of Liability $1,000,000 Construction Cost $10,000,001 to $20,000,000 Limit of Liability $1,500,000 Construction Cost $20,000,001 to $50,000,000 Limit of Liability $3,000,000 Construction Cost Over $50,000,000 Limit of Liability To be determined by Owner Applicant firms should be familiar with the above stated requirements prior to application. The firm(s) selected for the project(s) will be required to sign the state's standard Contract Between Owner and Designer. When these projects are financed either partially or entirely with Bonds, the award of the contract is contingent upon the sale of bonds or the issuance of a line of credit by the State Bond Commission. The State shall incur no obligation to the designer until the Contract Between Owner and Designer is fully executed. Firms will be expected to have all the expertise necessary to provide all architectural services required by the Louisiana Capital Improvement Projects Procedure Manual for Design and Construction for the projects for which they are applying. Unless indicated otherwise in the project description, there will be no additional fee for consultants. Facility Planning and Control is a participant in the Small Entrepreneurship Program (the Hudson Initiative) and applicants are encouraged to consider participation. Any Person Requiring Special Accommodations Shall Notify Facility Planning and Control of the Type(S) of Accommodation Required Not Less That Seven (7) Days Before the Selection Board Meeting. Applications Shall Be Delivered or Mailed or Emailed to : Louisiana Architects Selection Board C/o Facility Planning and Control The tentative meeting date for the Louisiana Architectural Selection Board is Wednesday, March 18, 2020 at 10:00 AM at the Claiborne Building, 1201 North Third Street, Room 1-153 Iowa, Baton Rouge, LA 70802. The method of contractor selection has not been determined at this time
Design
Warehouse / Distribution - Pre-Engineered Storage Building
$9,467,020.00
Public - State/Provincial
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2023
8124 LA-56, Chauvin, LA
Related To This Project
Chauvin, LA
Bid Date: Jan 27 2021
Chauvin, LA
--
Chauvin, LA
Bid Date: Sep 01 2022
Chauvin, LA
Bid Date: Mar 16 2023
Chauvin, LA
Bid Date: Sep 13 2023
Chauvin, LA
Bid Date: Feb 07 2023
Chauvin, LA
Bid Date: Oct 26 2023
Chauvin, LA
Bid Date: Dec 21 2023
Chauvin, LA
Bid Date: Dec 13 2022
Chauvin, LA
Bid Date: Dec 13 2022
Chauvin, LA
Bid Date: May 10 2023
Chauvin, LA
Bid Date: Mar 30 2023
Chauvin, LA
Bid Date: Nov 17 2022
Shreveport, LA
Bid Date: Apr 26 2022
Baton Rouge, LA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.