BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a mixed-use development in Edgerton, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Contract 20E-01, Regional Storm Pond and Marshview Court, Street and Utility Improvements. Location: Gear Drive, Edgerton, Wisconsin. The Work includes: The construction of a regional storm water pond near the intersection of Dallman Road and West Fulton Street. The pond outlet will discharge through the twin 36" storm pipes running under Dallman Road. Borrow from constructing the regional storm water pond will be used as fill for building up the new roadway area to the required grade elevations. There is additional excavation required below the pond bottom in order install a 2' thick clay liner. Clay material from the pond excavation will be salvaged and installed as clay liner. Also included in the project is a new street constructed off of Gear Drive along with the necessary new utility extensions for water, sewer and storm sewer and their appurtenances. The new asphalt roadway includes curb and gutter. Landscaping and final restoration are also included. The work also includes clearing and grubbing, stripping, stockpiling and salvaging topsoil. Storm outfall structures within the pond. Connections of new utilities to existing and erosion control measures.

Award

Sidewalks / Parking Lot

$362,219.00

Public - City

Paving, Site Work

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
504
Active Projects
233
Bidding Soon
3,382
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2020

April 13, 2020

Project location map

W Fulton St & N Dallman Rd, Edgerton, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.