BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a civil project in Davis, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The contract will be recommended for award on 11/16 to the apparent low bidder, GSE Construction. The start date will be in December or January. The work consists of construction of a pump station and pipeline for transferring recycled water including all labor, materials, equipment and incidentals, to completely install an operating facility, in accordance with the Project Plans and Specifications. The Phase 1 Recycled Water Facilities Project consists of construction ofthe following items: Construct a recycled water pump station as shown on the Contract Documents, which includes a single vertical turbine pump driven by a variable speed drive, situated outdoors in abelow-grade concrete structure. Install a suction pipeline from existing chlorine contact tank effluent channel to the new pump station. Install a discharge pipeline from the new pump station to the existing pipe underneath the levee. Install a pipeline from the the existing pipe underneath the levee to the recycled water discharge locations at the Recycled Water Storage Pond 1 and the Return Channel. Connect the new recycled water pipeline to the existing 24" OVFI pipeline. Install electrical equipment in the existing Filter Electrical Building and at the Recycled Water Pump Station. All associated site work, structures, electrical, instrumentation, and appurtenant facilities,complete and operable, all in accordance with the Contract Documents. All work shall be performed in accordance with the City ofDavis' Standard Specifications January 1996 Edition, Addenda through October 2009, the latest edition ofCalifornia Department of Transportation Standard Specifications and Plans dated 2015, Davis-Bacon Wage Determinations, General Prevailing Wage Rates, Labor Surcharge and Equipment Rental Rates, and the Contract Documents. The work consists of construction of a pump station and pipeline for transferring recycled water including all labor, materials, equipment and incidentals, to completely install an operating facility, in accordance with the Project Plans and Specifications. Each Bid shall be accompanied by cash, a certified or cashier's check, or Bid Bond secured from a surety company satisfactory to the City Council, the amount of which shall not be less than ten percent (10%) of the submitted Total Bid Price, made payable to City of Davis as bid security. The bid security shall be provided as a guarantee that within five (5) working days after the City provides the successful bidder the Notice of Award, the successful Bidder will enter into a contract and provide the necessary bonds and certificates of insurance. The bid security will be declared forfeited if the successful Bidder fails to comply within said time. No interest will be paid on funds deposited with City. The Bid Bond submitted shall be provided by a surety duly authorized by the Insurance Commissioner to transact surety business in the State of California. The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price. Each bond shall be in the forms set forth herein, shall be secured from a surety company that meets all State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer. This project contains no Federal Funding so this section is not applicable. For further information, contact Terry Jue, Associate Civil Engineer, at tjue@cityofdavis.org. Questions will only be considered and answered via email. Questions will not be considered or answered 24 working hours prior to the bid opening. 220 work days.

Award

Water / Sewer

$1,930,400.00

Public - City

New Construction, Site Work

46

19

10

4

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
82
Bidding Soon
1,549
All Active Projects
647
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 19, 2021

February 28, 2022

img_map_placeholder

Multiple Locations, Davis, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.