BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, remodeling and addition to a mixed-use development in Champaign, Illinois. Working plans call for the addition of a educational facility.

As of August 30, 2022, an architect has been selected and this project is in the final planning phase. It is anticipated bidding phase will start in February 2023, with a contractor award made by May 31, 2023. A firm timeline for start of construction has not been determined. *The closed solicitation has been included below for reference: Plans call for the High-Density Storage (HDS) Addition will be the first step in a multi-phased project to reconstruct the Main and Undergraduate Libraries. This addition to be located on the west end of the existing 6th stack will be a large climate-controlled vault capable of storing 1.5 million volumes in an 11,000 square foot footprint. The total area of the HDS Addition with the associated mechanical room is approximately 23,000 square foot. As part of this project, a new utility tunnel will be constructed to connect the existing Main Library Power Plant to the West Sixth Street steam tunnel and the new HDS Addition. Also part of this project will be the construction of a new Lecture Hall 66, a building addition to the southwest side of the Main Library. A new mechanical room will be constructed to house the mechanical and electrical systems to serve the HDS. The mechanical room roof will be designed to support new cooling towers that will replace the current cooling towers on the roof of the stacks. This project will construct the new cooling towers and demolish those currently existing on the roof of the stack area. Interior renovation work in the existing Main Library Building as part of this project will consist of a 3,600 square foot renovation of the main north/south corridor on the first floor, a 3,300 square foot renovation of the Grand Stair located between the north/south corridor and the Marshall Gallery and a renovation of the mechanical systems serving the existing 11,600 square foot Delivery Room on the 2nd floor. This project is part of State of Illinois Board of Higher Education Fiscal year 2020 Budget Recommendations. It is currently unknown what approvals have been obtained. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Final Planning

Library

$54,500,000.00

Public - State/Provincial

Addition, Paving, Remodeling, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
52
Bidding Soon
700
All Active Projects
342
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 30, 2023

img_map_placeholder

809 S Oak St, Champaign, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.