BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Lake Forest Park, Washington. Completed plans call for site work for a water / sewer project.

**As of 6/10/2020 Project bids were rejected /no result for rebid . Lake Forest Park Reservoir Floating Cover Replacement.This project consists of the following elements ofwork: Removal and disposal of existing floating cover. Design, manufacture, fabrication and installation of a new membrane liner over existing membrane liner and of a new floating cover, Installation of new storm water pumps and electrical power on the: floating cover and improvements to storm water pump hoses/ piping. Install bird wire across both cells. Perform site restoration. Perform 2 post construction inspections following Substantial Completion during a 2-year period as directed by the Owner. Membrane material must bechiorosulfonated polyethylene (CSPE) manufactured by BurkeIndustries. The Owner intends toissue a Notice to Proceed no laterthan March 1, 2021 The Engineers Estimate for this project is approximately $6,000,000 Please RSVP to Jessica.Guerrette@seattie.gov or at 206- 684-5074 at least 24 hours prior to the inspection time No bid will be accepted from any Bidder who does not attend at least one ofthe mandatory pre-bid meetings. For p poses ofthe Inclusion Plan, this is considered a Reservoir Floating Cover type of p roject with a Past Performance of 3% WMBE utilization rates based on completed projects. For questions please contact Miguel Beltran at Miguel. beltran@seattle.gov or 206-684- 4525. Back-up contact is Carmen Kucinski at carmen. kueins.ki@ seattle.gov or 206-684-0188. Bidders must understand the requirements of SMC 14.16 and RCW 49.46 and demonstrate compliance prior to Award. QUESTIONS: Written questions must be submitted no later than the close of business the Friday before the bid opening. This project is located north of NE 195th Street between 45th Avenue NE and 47 th Avenue NE in the City of Lake Forest Park : This project consists of the following elements of work: Removal and disposal of existing floating cover. Design, manufacture, fabrication and installation of a new membrane liner over existing membrane liner and of a new floating cover. Installation of new storm water pumps and electrical power on the floating cover and improvements to storm water pump hoses/piping. Install bird wire across both cells. Perform site restoration. Perform 2 post construction inspections following Substantial Completion during a 2-year period as directed by the Owner

Award

Water / Sewer

$7,565,282.00

Public - City

Site Work

118

1

4

7

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
32
Bidding Soon
916
All Active Projects
389
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2020

June 4, 2021

img_map_placeholder

NE 195th St, Lake Forest Park, WA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.