EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 23, 2020 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Lake Forest Park, Washington. Completed plans call for site work for a water / sewer project.

**As of 6/10/2020 Project bids were rejected /no result for rebid . Lake Forest Park Reservoir Floating Cover Replacement.This project consists of the following elements ofwork: Removal and disposal of existing floating cover. Design, manufacture, fabrication and installation of a new membrane liner over existing membrane liner and of a new floating cover, Installation of new storm water pumps and electrical power on the: floating cover and improvements to storm water pump hoses/ piping. Install bird wire across both cells. Perform site restoration. Perform 2 post construction inspections following Substantial Completion during a 2-year period as directed by the Owner. Membrane material must bechiorosulfonated polyethylene (CSPE) manufactured by BurkeIndustries. The Owner intends toissue a Notice to Proceed no laterthan March 1, 2021 The Engineers Estimate for this project is approximately $6,000,000 Please RSVP to Jessica.Guerrette@seattie.gov or at 206- 684-5074 at least 24 hours prior to the inspection time No bid will be accepted from any Bidder who does not attend at least one ofthe mandatory pre-bid meetings. For p poses ofthe Inclusion Plan, this is considered a Reservoir Floating Cover type of p roject with a Past Performance of 3% WMBE utilization rates based on completed projects. For questions please contact Miguel Beltran at Miguel. beltran@seattle.gov or 206-684- 4525. Back-up contact is Carmen Kucinski at carmen. kueins.ki@ seattle.gov or 206-684-0188. Bidders must understand the requirements of SMC 14.16 and RCW 49.46 and demonstrate compliance prior to Award. QUESTIONS: Written questions must be submitted no later than the close of business the Friday before the bid opening. This project is located north of NE 195th Street between 45th Avenue NE and 47 th Avenue NE in the City of Lake Forest Park : This project consists of the following elements of work: Removal and disposal of existing floating cover. Design, manufacture, fabrication and installation of a new membrane liner over existing membrane liner and of a new floating cover. Installation of new storm water pumps and electrical power on the floating cover and improvements to storm water pump hoses/piping. Install bird wire across both cells. Perform site restoration. Perform 2 post construction inspections following Substantial Completion during a 2-year period as directed by the Owner

Award

Water / Sewer

$7,565,282.00

Public - City

Site Work

118

1

4

7

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Price and Payment Procedures, Alternates, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Field Offices and Sheds, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 08 - Openings

Division 08 - Openings

Windows, Hardware, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Scales
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
62
Bidding Soon
1,037
All Active Projects
454
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2020

June 4, 2021

img_map_placeholder

NE 195th St, Lake Forest Park, WA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Lake Forest Park Reservoir Floating Cover Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.