Published October 2, 2020 at 8:00 PM

Updated October 1, 2024

Demolition, site work, renovation and addition to a detention facility in Coxsackie, New York. Completed plans call for the addition of a detention facility; for the demolition of a detention facility; for the renovation of a detention facility; and for site work for a 4,800-square-foot, two-story above grade detention facility.

Estimated Cost $7,000,000 - $8,000,000 The existing ventilation systems, both supply air and exhaust air equipment serving Building 45 must remain in service until the replacement ventilation equipment is installed, cleaned and tested. The hot water supply and return piping systems may be taken out of service only during the Non-Heating Season from May 1st through October 15th. C. Perform the following Work during the Non-Heating Season from May 1st through October 15th, 2020: 1. Install air handlers AHU-1 and AHU-2: a. Install the concrete pads, set the air handler and modify the outside air ductwork to allow for AHU-1 and AHU-2 to be installed while he existing equipment is operational. Include all related electrical and controls work to support the air handlers temporarily, until the complete HVAC system can be installed. D. Perform the following Work during the Non-Heating Season from May 1st through October 15th, 2020: 1. Equipment Removals and replacement of HX-1, HX-2, EF-1 and EF-2: a. During this phase, only the air handler will be operating and therefore only outside air or supply air will be provided to the spaces. Excess supply air will be relieved through the existing gravity relief systems in the core and open ducts throughout the space. C Contract- Submittal No. 4: Site Specific Safety Plan per Specification 011100 Safety not later than 5 days after approval of the Contract by the Comptroller. C Contract- Submittal No. 5: Truck Trap, Fencing, Gates, Security System Plan pe Specification 011100 not later than 5 days after approval of the Contract by the Comptroller. C Contract- Submittal No. 6: Woven Rod Detention Screen Shop Drawings and Product Data per Specification 055000 Metal Fabrications not later than 5 days after approval of the Contract by the Comptroller. C Contract- Submittal No. 7: Structural Steel Shop Drawings and Product Data per Specification 051200 Structural Steel not later than 5 days after approval of the Contract by the Comptroller. C Contract- Submittal No. 8: Shop Drawings and Product Data per Specification 085662 Steel Detention Windows not later than 5 days after approval of the Contract by the Comptroller. C Contract- Submittal No. 9: Schedule, Shop Drawing Package per Specification 081102 Steel Doors and Frames, 111901 Detention Equipment not later than 5 days after approval of the Contract by the Comptroller. C Contract- Submittal No. 10: Brick Veneer Product Data and Sample per Specification 042113 Brick Masonry not later than 5 days after approval of the Contract by the Comptroller.

Award

Jails / Prisons

$6,741,800.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

137

29

20

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Mockups, Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Post-Tensioned Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Sheathing, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Roofing and Siding Panels, Fire and Smoke Protection, Applied Fireproofing, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Partitions, Wire Mesh Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Other Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fire Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Concrete Curbs and Gutters, Site Improvements, Fences and Gates, Retaining Walls, Screening Devices, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations, Site Grounding, Site Lightning Protection
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
293
Active Projects
178
Bidding Soon
2,102
All Active Projects
957
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2020

May 29, 2020

img_map_placeholder

165 Plank Rd, Coxsackie, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Provide New Addition Classrooms and Office Spaces, Building 45 - Residential Rehabilitation Unit - Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.