BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a detention facility in Coxsackie, New York. Completed plans call for the addition of a detention facility; for the demolition of a detention facility; for the renovation of a detention facility; and for site work for a 4,800-square-foot, two-story above grade detention facility.

Estimated Cost $7,000,000 - $8,000,000 The existing ventilation systems, both supply air and exhaust air equipment serving Building 45 must remain in service until the replacement ventilation equipment is installed, cleaned and tested. The hot water supply and return piping systems may be taken out of service only during the Non-Heating Season from May 1st through October 15th. C. Perform the following Work during the Non-Heating Season from May 1st through October 15th, 2020: 1. Install air handlers AHU-1 and AHU-2: a. Install the concrete pads, set the air handler and modify the outside air ductwork to allow for AHU-1 and AHU-2 to be installed while he existing equipment is operational. Include all related electrical and controls work to support the air handlers temporarily, until the complete HVAC system can be installed. D. Perform the following Work during the Non-Heating Season from May 1st through October 15th, 2020: 1. Equipment Removals and replacement of HX-1, HX-2, EF-1 and EF-2: a. During this phase, only the air handler will be operating and therefore only outside air or supply air will be provided to the spaces. Excess supply air will be relieved through the existing gravity relief systems in the core and open ducts throughout the space. C Contract- Submittal No. 4: Site Specific Safety Plan per Specification 011100 Safety not later than 5 days after approval of the Contract by the Comptroller. C Contract- Submittal No. 5: Truck Trap, Fencing, Gates, Security System Plan pe Specification 011100 not later than 5 days after approval of the Contract by the Comptroller. C Contract- Submittal No. 6: Woven Rod Detention Screen Shop Drawings and Product Data per Specification 055000 Metal Fabrications not later than 5 days after approval of the Contract by the Comptroller. C Contract- Submittal No. 7: Structural Steel Shop Drawings and Product Data per Specification 051200 Structural Steel not later than 5 days after approval of the Contract by the Comptroller. C Contract- Submittal No. 8: Shop Drawings and Product Data per Specification 085662 Steel Detention Windows not later than 5 days after approval of the Contract by the Comptroller. C Contract- Submittal No. 9: Schedule, Shop Drawing Package per Specification 081102 Steel Doors and Frames, 111901 Detention Equipment not later than 5 days after approval of the Contract by the Comptroller. C Contract- Submittal No. 10: Brick Veneer Product Data and Sample per Specification 042113 Brick Masonry not later than 5 days after approval of the Contract by the Comptroller.

Award

Jails / Prisons

$6,741,800.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

137

29

20

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
362
Active Projects
197
Bidding Soon
2,812
All Active Projects
1,156
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 31, 2020

May 29, 2020

img_map_placeholder

165 Plank Rd, Coxsackie, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.