BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2020 at 7:00 PM

Updated July 30, 2025

Site work for a bridge / tunnel in Mulmur, Ontario. Completed plans call for site work for a bridge / tunnel.

The Work includes the rehabilitation of a 11 m span concrete T-beam bridge (Bridge 7) and the rehabilitation of a 9.2 m span cast-in-place concrete rigid frame (Bridge 9), which includes the following at both sites: - Installation of erosion control measures. - Management of the watercourse during construction, as required. - Concrete patch repairs. - Remove asphalt/fill over deck and approaches. - Concrete overlay, waterproofing and asphalt paving. - Barrier removal and replacement. - Associate road works and grading. - Installation of steel beam guide rail and end treatments. - Restoration of the site upon completion of the work.

Award

Bridges / Tunnels

$707,701.00

Public - City

Site Work

20

1

6

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2020

April 20, 2020

Project location map

Multiple Locations, Mulmur, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.