BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 10, 2022 at 8:00 PM

Updated February 9, 2024

Renovation of a detention facility in Farmington, Missouri. Completed plans call for the renovation of a detention facility.

Replace Roof Systems, Multiple Assets at Farmington Correctional Center Bidders must be registered to bid. The project includes The Project consists ofthe complete tear-offofthe existing shingle roofing system, removal of existing dormers, repair ofexisting wood soffits and fascia and installation of a new standing seam metal roofing system at seven (7) buildings located at Farmington Correctional Center (FCC). The buildings included in this project include the following: Medical Building #16, Food Service Building #17 A-side, Education Building #18, Library Building #19, Boot Camp Building #31, Chapel Building #32 B-Side, and Warehouse Building #33 B-Side.

Award

Jails / Prisons

$1,701,000.00

Public - State/Provincial

Renovation

31

17

2

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
89
Bidding Soon
1,306
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2022

September 26, 2022

Project location map

1012 W Columbia St, Farmington, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.