BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and asbestos abatement for a museum in Springfield, Illinois. Completed plans call for site work for a museum; and for asbestos abatement for a museum.

As of June 10, 2020 this project has not yet been awarded. As of May 1, 2020 there is an addendum 4. Please contact owner for further details. Estimated to be under $250,000 Asbestos Abatement of thermal pipe insulation and vinyl asbestos floor tile and mastic in selected areas of the North wing of the Capitol building. a. Using Agency will remove furniture, equipment and loose objects from the areas where abatement will occur. b. Secretary of State (SOS) maintenance staff shall continue to maintain all building systems in other occupied areas of the building. Contractor shall cooperate with SOS and minimize any impact the Construction work may have on the existing systems, and shall coordinate shutdowns and cutovers with SOS personnel. Where existing systems affecting other occupied areas of the building are required to be temporarily shut-down, coordinate such shut-downs with the Owner; shut-downs will typically have to be scheduled overnight or on weekends, with no additional costs for overtime or premium time incurred by the Owner. c. A project to construct a new below-grade mechanical room on the East side of the North wing, along with minor remodeling within the building will be ongoing at the same time as this project. Contractor shall fully cooperate with other Contractors with regards to site staging and interface between the two projects. The VBE goal for this contract is 0 percent The MBE/WBE goal for this contract is 0 percent North Wing Renovation, Illinois State Capitol, Asbestos Abatement -Phase I The contractor shall complete all work through Substantial Completion in accord with the contract within forty (40) consecutive calendar days from the date of the Authorization to Proceed and shall complete all remaining work in accordance with the contract (Final Acceptance) within thirty (30) consecutive calendar days from the date of Substantial Completion.

Bid Results

Museum

$141,980.00

Public - State/Provincial

Asbestos Abatement, Site Work

15

13

6

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
27
Bidding Soon
522
All Active Projects
216
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2020

July 20, 2020

img_map_placeholder

526 E Adams St, Springfield, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.