BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in The Colony, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of November 20,2020 the awarded contractor was RoeschCo Construction, Inc. The award amount was $1,314,384.20. The preconstruction meeting is scheduled for next Monday, November 23, 2020 and construction should start shortly thereafter. Cascades/Grandscape Trail The scope of work consists of the construction of a 12-foot wide concrete hike and bike trail from the Marriot Hotel parking lot north of the Sam Rayburn Tollway Service Road to the Destination Drive and Grandscape Boulevard intersection, and any other work deemed necessary by the City of The Colony. Drainage, retaining wall, fencing, andrailing improvements are provided at various locations along the length of the project. Additionally, signage for an onstreet portion of the bike trail from the Memorial Drive and Fallwater Court intersection to the beginning of the concretetrail is also included. The work includes, but is not limited to, mobilization, preparation of right-of-way, traffic control,approximately 2,552 SY 5-inch thick reinforced concrete pavement, 21 LF of 4-foot by 3-foot reinforced concrete box, 5,362 SF of retaining wall, and 1,116 LF 8-foot tall chain link fence. The opinion of probable construction cost for the overall project is $1,400,000. The project, as currently planned, will consist of an approximate %-mile hike and bike trail extending southward from the north side of Sam Rayburn Tollway (State Highway 121) to Grandscape Boulevard in The Colony, Texas. Retaining walls are planned along the route, with heights on the order of approximately 8 feet or less. A soil nail wall is being considered for that portion of the trail that passes beneath the Sam Rayburn Tollway. Global slope stability analyses of proposed retaining walls is beyond the scope for this study. Plate A.1, Plan of Borings, presents the project vicinity and approximate locations of the exploration borings. Q & A deadline: Oct 21, 2020 3:00:00 PM EDT

Award

Roads / Highways

$1,314,384.00

Public - City

Paving, Site Work

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
66
Bidding Soon
3,531
All Active Projects
1,402
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2020

December 21, 2020

img_map_placeholder

Multiple Locations, The Colony, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.