BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 20, 2020 at 7:00 PM

Updated September 15, 2023

Site work and paving for a mixed-use development in The Colony, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of November 20,2020 the awarded contractor was RoeschCo Construction, Inc. The award amount was $1,314,384.20. The preconstruction meeting is scheduled for next Monday, November 23, 2020 and construction should start shortly thereafter. Cascades/Grandscape Trail The scope of work consists of the construction of a 12-foot wide concrete hike and bike trail from the Marriot Hotel parking lot north of the Sam Rayburn Tollway Service Road to the Destination Drive and Grandscape Boulevard intersection, and any other work deemed necessary by the City of The Colony. Drainage, retaining wall, fencing, andrailing improvements are provided at various locations along the length of the project. Additionally, signage for an onstreet portion of the bike trail from the Memorial Drive and Fallwater Court intersection to the beginning of the concretetrail is also included. The work includes, but is not limited to, mobilization, preparation of right-of-way, traffic control,approximately 2,552 SY 5-inch thick reinforced concrete pavement, 21 LF of 4-foot by 3-foot reinforced concrete box, 5,362 SF of retaining wall, and 1,116 LF 8-foot tall chain link fence. The opinion of probable construction cost for the overall project is $1,400,000. The project, as currently planned, will consist of an approximate %-mile hike and bike trail extending southward from the north side of Sam Rayburn Tollway (State Highway 121) to Grandscape Boulevard in The Colony, Texas. Retaining walls are planned along the route, with heights on the order of approximately 8 feet or less. A soil nail wall is being considered for that portion of the trail that passes beneath the Sam Rayburn Tollway. Global slope stability analyses of proposed retaining walls is beyond the scope for this study. Plate A.1, Plan of Borings, presents the project vicinity and approximate locations of the exploration borings. Q & A deadline: Oct 21, 2020 3:00:00 PM EDT

Award

Roads / Highways

$1,314,384.00

Public - City

Paving, Site Work

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
385
Active Projects
173
Bidding Soon
3,761
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2020

December 21, 2020

Project location map

Multiple Locations, The Colony, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.