BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in North Fond du Lac, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The work for which bids are asked includes the following: Bechaud Avenue and McKinley Street: unclassified roadway excavation; miscellaneous erosion control and traffic control; 8,300 TON of aggregate base installation; 8 sanitary manholes; 2,350 LF of sanitary sewer and laterals (6" thru 8" PVC); 1,800 LF of water main (6" thru 8" PVC); 700 LF of water services (1" HDPE); 34 storm sewer structures; 650 LF of storm sewer (8" thru 30" HDPE); and all other related work. Polk Street: unclassified roadway excavation; miscellaneous erosion control and traffic control; 2,150 TON of aggregate base installation; 9 storm sewer structures; 1,450 LF of storm sewer (12" thru 42" HDPE); and all other related work. A Bidder's Proof of Responsibility must be submitted to Mr. Nick Leonard, Village Administrator, 16 Garfield Street, North Fond du lac, WI 54937, prior to the close of business, 4:30 PM local time on March 24, 2020. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. BIDDER is required to deliver the original certified check or bid bond within the 72 hours of bid opening to MSA Professional Services, Inc., Attn: Todd M. Janssen, 201 Corporate Drive, Beaver Dam, WI 53916. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdraw within 60 days after the actual date of the opening thereof. The minimum wages to be paid on the project shall be in accordance with Federal Davis Bacon Wage Rates. Federal wage rates can be found at Online portal. Be aware that project Administrators, Bidders, and Contractors are required to use the latest federal wage rate available at the time of bid opening. This project anticipates use of Wisconsin DNR Safe Drinking Water Loan Program OR Clean Water Fund Program funding. We encourage Disadvantaged Business Enterprises (DBEs), including Minority-owned Business Enterprises (MBEs), and Women's Business Enterprises (WBEs) to submit bid proposals. A municipality, in awarding prime contracts, and the primary engineer and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of 15% participation for MBE/WBE utilization in accordance with s.NR 162.09(3), s.NR 166.12(4), and s.NR 167.18(4) Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. The Contractor shall conform to the "Use of American Iron and Steel" provision of H.R. 3547 Consolidated Appropriations Act, 2014, section 436, including all iron and steel products used in the project. Bid Proposals may be denied if the requirements of this section are not met and waivers are required. EPA guidance for the use of American Iron and Steel (AIS) can be found at online portal. OWNER reserves the right to waive any informalities or to reject any or all bids.

Award

Roads / Highways

$947,913.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
41
Bidding Soon
757
All Active Projects
289
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2020

May 29, 2020

img_map_placeholder

Multiple Locations, North Fond du Lac, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.