Published February 13, 2025 at 7:00 PM

Updated February 14, 2025

Site work for a water / sewer project in Ankeny, Iowa. Completed plans call for site work for a water / sewer project.

The SW Walnut Street and SW Ordnance Road Water Main shall include the installation of approximately 3,550 LF of 8" water main along the west side of SW Walnut Street from SW 3rd Street to the north side of SW Ordnance Road, and along SW Ordnance Road from SW Cherry Street to an existing main adjacent to the police station. The water main along SW Walnut Street shall be bored installation while the water main along SW Ordnance Road shall be a combination of bored and open cut installation. Project also includes the addition of on-street diagonal parking on the west side of SW Walnut from approximately 125' south of SW 3rd Street to approximately 70' south of the High Trestle Trail. The construction improvements include approximately 3,120 LF of trenchless 8" water main, 430 LF of trenched 8" water main, approximately 1,330 SY of 7" thick PCC Class C-SUD street pavement, Class 10 excavation, subgrade preparation, driveways, sidewalks, pavement markings, temporary surface restoration, permanent surface restoration, temporary traffic control, mobilization, and miscellaneous associated work necessary to complete the project. The Contractor shall substantially complete the overall project within one hundred thirty (130) working days. Substantial completion for the overall project shall be defined as all utility, grading, and pavement construction completed; with the new pavement markings and signs installed; and the driveways, and sidewalks fully open to traffic. A mandatory six-day work week is not required; however, working days will be charged on Saturdays if the Contractor elects to perform bid item work on Saturdays. Should the Contractor fail to substantially complete the work in this timeframe, liquidated damages of One Thousand Dollars ($1,000.00) per calendar day will be assessed for work not substantially completed within the designated Contract term(s). The Contractor shall fully complete the overall project within ten (10) working days after the punch list has been provided to the Contractor following substantial completion of the overall project. Full completion for the overall project shall be defined as all work including permanent surface restoration and punch list items completed, and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work in this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s). A fee of Fifty Dollars ($50.00) per set will apply to additional sets and to bidding documents requested by other than prospective bidders. This fee is refundable, provided the following conditions are met: (1) The Contract Documents are returned complete and in a good usable condition. (2) They are returned within fourteen (14) calendar days after the award of the project. An individual must call 515-964-1920 in advance to reserve a paper copy. From SW 3 rd Street to SW Ordnance Road along SW Walnut Street and from SW Cherry Street to the Ankeny Police Station along SW Ordnance Road Minority-Owned Business Enterprise (MBE) Goal Women-Owned Business Enterprise (WBE) Goal Construction 1.7% 2.2% Supplies 0.6% 5.6% Services 2.5% 11.3% Goods/Equipment 2.5% 10.4% Average 1.8% 7.4% utilization goal MBE (5%), WBE (7%)

Bid Results

Water / Sewer

$1,144,144.00

Public - City

Site Work

51

6

12

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
104
Bidding Soon
1,161
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

April 14, 2025

Project location map

SW Ordnance Rd & SW Walnut St, Ankeny, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.