BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 4, 2025 at 7:00 PM

Updated November 5, 2025

Site work, new construction and renovation of a mixed-use development in Edmonton, Alberta. Conceptual plans call for the construction of a multi-residential development; retail development; for the renovation of a municipal facility; and industrial development.

Plans call for the transformation of West Rossdale into a vibrant community. The River Crossing is located in the heart of Edmonton between downtown and Old Strathcona area, and borders the Provincial Legislature grounds. Located within the North Saskatchewan River Valley, River Crossing has easy access to riverside trails and valley amenities. The City and the municipally-owned EPCOR Utilities Inc. own a majority of the land in River Crossing but Edmonton Public Schools and a few private entities also own land. The River Crossing is home to significant historical legacies such as Traditional Burial Grounds / Fort Edmonton Cemetery, the Rossdale Power Plant, Ortona Armoury, Ross Flats Apartment and RE/ MAX Field ballpark. Through a multi-phased approach, the transformation is expected to see these existing structures and open spaces redeveloped for re-use. Other municipal projects will include various infrastructure projects (transportation, utilities and flood mitigation). Future developments will potentially include various multi-residential and retail developments within the subject area (by the private sector). A low carbon District Energy System (DESS) may be implemented. TIMELINE: Conceptual planning is ongoing. Reshape Infrastructure Strategies Ltd. has completed a feasibility study for the implementation of the District Energy System. The Ortona Armoury Rehabilitation has been rehabilitated. Concept design for a new river valley park between Rossdale Rd. and 96 Ave has been initiated. The owner is currently requesting proposals from interested parties for adaptive reuse of the Rossdale Power Plant. Further update may be available in 2026. Ongoing and upcoming infrastructure projects within this area will be published separately. *Construction cost is undefined.

Conceptual

Multi-Residential

$10,000,000.00

Public - City

New Construction, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
32
Bidding Soon
567
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.