Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 29, 2020 at 8:00 PM
Updated October 1, 2024
Site work and paving for a mixed-use development in Mequon, Wisconsin. Completed plans call for site work for a water / sewer project; and for paving for a sidewalk / parking lot.
The City of Mequon, Wisconsin, by the undersigned Director of Public Works/City Engineer, will receive Bids for the Catch Basins, Storm Sewer, and Curb and Gutter as follows: Project includes catch basin repair or replacement, asphalt patch and restoration in the Mequon Business Park and Westchester Subdivision. Project includes 54 catch basins in the Mequon Business Park and 40 catch basins in the Westchester Subdivision that require repair or replacement. Also included is Curb & Gutter replacement and storm sewer repair. This PROJECT is included in the Wisconsin Department of Transportation's Local Road Improvement Program (LRIP) in the Municipal Street Improvement(MSI) program category. ENGINEERING PROJECT FILE NO. 3098- 20A Bids shall be submitted on the forms included in the bidding and contract requirements section of these Contract Documents. A $5 shipping and handling charge will apply for hard copy manuals that are mailed. All work can start after June 1, 2019 and shall be completed by October 16th 2020. Failure to meet this deadline will result in the assessment of liquidated damages as specified by the contract documents. In accordance with State Statute 66.0901(2), Bidders shall be required to submit a statement of financial ability, equipment, and experience in the work prescribed. This Qualification Statement shall be submitted to the office of the Engineer no less than five days prior to the opening of bids. Failure to submit a qualification statement at least five days prior to bid opening will result in the rejection of the bid. Qualification Statement forms can be obtained at the office of the City Engineer. Review of qualification statements will be made by the Engineer prior to award. Those firms whose qualifications are found to be unacceptable shall be disqualified from consideration of award. A certified check, or satisfactory Bid Bond payable to the City of Mequon in the amount of not less than five (5%) percent of the Bid shall accompany each Bid as guarantee that if the Bid is accepted the Bidder will execute and file the Contract Performance Bond and Insurance Certificate as required by this contract within ten (10) calendar days after Notice of Award of the Contract by the City. The City reserves the right to reject any and all Bids, waive any informalities or irregularities in Bid ding or accept any Bid or Bids which, in the opinion of the City, shall serve the City's best interest. No Bid may be withdrawn for a period of forty-five (45) days after the time and date set for the opening thereof, without the consent of the City. It is anticipated that authorization to award to the selected qualified, responsive and responsible low bidder will be granted at the April 14th, 2020 Common Council meeting. The selected contractor shall, within ten (10) calendar days after notification, provide to the City of Mequon the required contract documents for signature.
Award
Sidewalks / Parking Lot
$368,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2020
June 1, 2020
Multiple Locations, Mequon, WI
Related To This Project
Mequon, WI
Bid Date: Jan 24 2019
Mequon, WI
Bid Date: Sep 30 2021
Mequon, WI
Bid Date: Mar 01 2022
Mequon, WI
Bid Date: Mar 01 2022
Mequon, WI
--
Mequon, WI
Bid Date: Jan 06 2023
Mequon, WI
Bid Date: Jan 06 2023
Mequon, WI
--
Mequon, WI
--
Mequon, WI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.