BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Le Mars, Iowa. Completed plans call for site work for a road / highway; and water / sewer project.

As of May 21 2020 this project is in construction. The work to be completed generally consists of approximately: 800 C.Y. of 6" Topsoil, On-site; 6415 C.Y. of Excavation, Class 10 Select Borrow; 200 LF of Storm Sewer, Trenched, 2000D RCP; 1 EA Manhole, Circular Storm Sewer, SW-401; 986 S.Y. of Pavement Removal; 1 LS of Temporary Traffic Control; 1.5 AC of Conventional Seeding, Seeding, Fertilizing and Hydro-Mulching; 4240 S.Y. of Type 2 Temporary RECP; 749 L.F. of Silt Fence; 130 SY of Stabilized Construction Entrance. All proposals shall be made on official proposal forms furnished by the Engineer and shall contain worded and figured prices for the work bid on. All proposals shall be plainly legible, sealed, and addressed to the City of Le Mars, Attn: Jason Vacura, City Administrator, 40 Central Ave SE, Le Mars, IA 51031. Bidder shall submit a Bidder Status Form with their bid. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed unresponsive and rejected. A certified check or a bid bond of a reputable bonding company authorized to do business in the State of Iowa in an amount not less than ten percent (10%) of the total amount of the bid shall be included in a separate sealed envelope, plainly marked "bid bond". The bid guarantee shall be forfeited as liquidated damages if the successful bidder fails proper execution. The checks or bid bonds of the lowest two or more bidders may be held for the earlier of 7 days after the effective date of the agreement or 61 days after the bid opening, whereupon Bid Security furnished by such bidders will be returned. Other checks or bid bonds will be returned after the tabulation of bids is completed. Performance and Payment Bonds: The successful bidder must execute performance and payment bonds, each in an amount equal to one hundred (100%) percent of the contract amount to ensure a timely, efficient, and complete performance. The bonds shall be issued from a reputable bonding company authorized to do business in the State of Iowa. The right to accept or reject any or all bids and to waive informalities is reserved.

Under Construction

Water / Sewer

$198,000.00

Public - City

Site Work

23

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
13
Bidding Soon
219
All Active Projects
111
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2020

May 20, 2020

img_map_placeholder

205 5th Ave NW, Le Mars, IA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.