BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Colorado Springs, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

There is one addendum on the project, please see the owner for more information. This trail construction project will complete the alignment for the Sinton trail system and allow for safe access to the trail for a large amount of trail users, including walkers, runners, and cyclists. Work to be completed under this contract consists of furnishing all labor, materials, and equipment required to install 10-foot-wide concrete trail for the planned segment of Sinton Trail adjacent to Garden of the Gods Road, between 30th Street and Arrowswest Drive. These improvements must meet the standards for The Americans with Disabilities Act (ADA). This project will also include improvements to crossings/right-of-way, and installation of retaining wall to make way for the trail. Locations and additional project details can be found on the included project site map and plan set. Buyers Requirements General Requirements - Insurance Required Bonding Requirements - Bid Bond 5 % Job Location Sinton Trail adjacent to Garden of the Gods Rd Question Acceptance Deadline 06/22/2022 04:00 PM EDT Questions are submitted online No

Post-Bid

Roads / Highways

$600,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
58
Bidding Soon
735
All Active Projects
324
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2022

August 5, 2022

img_map_placeholder

Sinton Trail, Colorado Springs, CO

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.