BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Montgomery, Alabama. Completed plans call for the renovation of a municipal facility.

Requirements for Pre-qualification of Grouting Contractors: Grouting Contractors (whether Sub or Prime) shall contact the Architect at mckeeplans@ gmail.com to receive the criteria to be used for the pre-qualification of project. The scope of work includes Floor repairs consisting of concrete slab replacement, pressure grouting, micropiles, floor leveling & other repairs. The bracket of cost is $1,500,000 to $2,000,000.00. Proposal shall be submitted on the proposal form included in the bid documents. No bid may be withdrawn after scheduled closing for receipt of bids for a period of sixty (60) days. The owner reserves the right to accept or reject any and all bids and waive technicalities. Contract shall not be binding upon either party of considered closed until approved by the Mayor of the City of Montgomery. The successful bidder is required to carry Workmen's Compensation Insurance and Public Liability Insurance, and if a subcontractor is employed, Contractor's Contingent Liability Insurance. Bidders are required to file with bid a certified check or bid bond through a surety company authorized to do business in the State of Alabama; either form made payable to the City for an amount not less than 5% of the City's estimated cost or of the contractor's bid, but in no event more than $10,000.00. Bidders are hereby notified that all provisions of Section 80, Act No. 571 Regular Session of June 19, 1959, approved November 19, 1959, entitled "An Act to Regulate the Licensing of General Contractors" shall be strictly observed. Also, it is necessary for persons submitting bids for work involving $50,000.00 or more to show satisfactory evidence of license as a general contractor. A bond in a reliable surety company authorized to do business in the State of Alabama must be given by the successful bidder, such bond to be for the sum of 100% of the contract price conditioned for the prompt and faithful performance of contract terms and a surety bond in the amount equal to 50% of the contract prices as security for the payment for all persons performing labor and furnishing materials in connection with the contract. The City of Montgomery is desirous of a good faith demonstration of efforts for acquiring DBE participation for all public works projects, and particularly encourages all DBE contractors to submit a bid. The City of Montgomery is required to comply with the Beason-Hammon Alabama Taxpayer and Citizen Protection Act, 31-13-1 et seq. of Code of Alabama 1975 (Act No. 2011-535), subsequently all bidders are required to submit an E-Verify Affidavit stating they are enrolled in the E-Verify Program and the entire associated Memorandum of Understanding on the outside of their sealed bid proposals. The E-verification documents need to be inspected prior to the sealed bid being opened. Electronic images of the documents may be viewed electronically and printed by General Contractors, Sub-Contractors and Suppliers by obtaining documents through the architect's portal or by contacting the Architect at mckeeplans@gmail.com for log-in information and password. Please provide company name, address, phone #, fax #, email address and GC License The Architect is unable to monitor, confirm and maintain websites that are beyond his control. Addendums shall be posted on the portal. The Architect retains ownership and copyrights of the documents. General Contractors, Sub-Contractors and Suppliers may acquire printed Contract Documents by submitting to the Architects a deposit of $75.00 per set upon receipt of the deposit. The deposit shall be refunded for each set returned in reusable condition within ten days after bid opening. All RFI's and RFA's regarding the bid documents shall be sent and addressed thru the following e-mail account: chesnuttt@mckeeassoc.com. The Architect will not accept inquires via telephone or fax. Supervision: Contractor to provide Superintendent(s) to ensure proper supervision for all work. Completion Time: All work shall be performed between June 1, 2020 & August 31, 2020 building is available 7 days a week, 24 hours per day. *This project timeline has been extended due to the public health crisis.

Post-Bid

Municipal

$2,000,000.00

Public - City

Renovation

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
20
Bidding Soon
448
All Active Projects
181
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2020

June 1, 2020

img_map_placeholder

220 Hall St, Montgomery, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.