BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Richmond, Virginia. Completed plans call for the construction of a stadium; and six-acre educational facility.

As of June 7, 2024, construction had commenced in May 2024, on the 42 acres that will eventually house the school’s “Athletic Village” at 2601-2901 Hermitage Road. A design team and construction manager have been identified. An off-campus VCU Athletic Village will offer new sports fields and facilities, including a tennis center, practice fields, a baseball stadium and field house. This plan returns on-campus real estate to serve academic and student needs, reduces travel and increases practice times for teams, and offers new opportunities for community impact through youth programming. The University intends to demolish five structures along Hermitage Road in order to build Phase 1 of its sprawling, 40-acre athletics village. The university will use athletic department funds to pay for the demolition. Eventually, VCU plans to knock down two other adjacent buildings to make way for the rest of the athletics village. The phased project is expected to be built generally starting from the south end of the assemblage moving north. The southernmost parcels, including the Greyhound facility and a former Salvation Army center, are planned to be developed first. A pair of fields and a track and field center are planned to rise on that 15-acre plot. Following that phase, the vacant, 365,000-square-foot former ABC (Virginia Alcoholic Beverage Control Authority) headquarters would be demolished to make way for a dozen outdoor and six indoor tennis courts and a soccer stadium. The fourth and final phase would be a multi-use building with an indoor track and eight futsal courts on a 6-acre property at 1609 Sherwood Ave. 2024-2026 Biennium is in planning for Athletic Village - Outdoor Track Facilities and Practice Fields (replaces Sports Backers Stadium) and the Athletic Village - Tennis Center as potential university funded projects. 2028-2030 Biennium Athletic Village Indoor Field House.

Under Construction

Arenas / Stadiums

$38,000,000.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
31
Bidding Soon
815
All Active Projects
339
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.