Site work for a water / sewer project in Newport Beach, California. Completed plans call for site work for a water / sewer project.

The work necessary for the completion of this contract includes, but is not limited to, mobilization, traffic control, water pollution control, potholing and field verifications of existing utilities, trench construction, furnishing and installing conduit with poly-pull ropes including service lateral runs, utility pullboxes, handholes, vaults and all associated items necessary for the conversion of existing overhead and electrical power, telephone, and cable television services to underground locations as required and intended by the Plans, Specifications, and further specified by Southern California Edison, AT&T and Spectrum standards within UNDERGROUND UTILITY ASSESSMENT DISTRICT NO. 111, UUD-22 - PHASE 2, AND UTILITY UNDERGROUNDING FOR MCFADDEN ALLEYS AND COURT STREET. Any costs resulting from work performed that was directed by Southern California Edison, AT&T and Spectrum engineers, inspectors or other personnel will not be compensated unless said work was approved by the Engineer prior to work commencing. Contractor shall perform all trenching, backfill, pavement restoration, resurfacing and replacement of existing improvements (public or private including but not limited to driveways, fences, walls, signs, landscaping, mailboxes, and other such items) associated with or resulting from the work identified herein. In areas where SCE plans show existing handholes are being upsized to accommodate additional conduits or where new conduits are being installed to accommodate the undergrounding efforts, SCE handhole and intercept work shall be included in the Contractor's bid, however the SCE source contractor for this area (Arizona Pipeline) will be required to install all handholes and intercept vaults where live or dead electrical wires are to be encountered at service handhole and intercept locations. SCE requests that at least three locations be made available when Arizona Pipeline's efforts are required. Contractor is required to give (7) seven calendar days' notice of planned service hand hole or intercept efforts required by Arizona Pipeline. Contractor shall submit a detailed Schedule of Values for this lump sum bid to the Engineer within 3 days after award of contract for review and approval. The agreed upon Schedule of Values will be used as a basis for monthly progress payments and will be agreed upon by the City and Contractor prior to the Award of contract. Lump Sum Bid will be guaranteed for a period of one hundred eighty (180) days. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Type of award lump sum. Liquidated damages $1000/-Day. Estimated cost $7,000,000.00. License requirement contractor license "A". Project duration 220 working days.

Award

Water / Sewer

$683,775,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
116
Bidding Soon
2,461
All Active Projects
1,097
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2020

September 15, 2020

img_map_placeholder

Court St & Mc Fadden Pl, Newport Beach, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.