Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 18, 2020 at 8:00 PM
Updated September 15, 2023
Site work and paving for a sidewalk / parking lot in Spokane, Washington. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
This project consists of the construction of approximately 140 ADA accessible wheelchair ramps, including 5,000 linear feet curb removal and replacement, 2,800 square yards of sidewalk, pavement repair, sundry utility adjustments, and other related miscellaneous items. Range: $700,000.00 to $900,000.00 The City of Spokane, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulation, Department of Transportation, subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-Assisted Programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color or national origin, or sex in consideration for an award. Bids shall be submitted on the forms provided in accordance with the provisions of the Specifications. Irregular bid proposals will be rejected in accordance with the specifications. Cash, cashier's check, a certified check or surety bond in the sum of five percent (5%) of the Total Project Bid must accompany the copy of the bid filed with the City Clerk. Successful bidder shall execute the Contract within TEN (10) calendar days after receiving the Contract. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated herein, the bid proposal deposit shall be forfeited to the City of Spokane. The City of Spokane will normally award this Contract or reject bids within FORTY FIVE (45) calendar days after the time set for the bid opening. If the lowest responsible Bidder and the City of Spokane agree, this deadline may be extended. If they cannot agree on an extension by the 45-calendar day deadline, the City of Spokane reserves the right to Award the Contract to the next lowest responsible Bidder or reject all Bids. The City of Spokane is using WSDOT's 2020 Standard Specifications. Bidders should allow sufficient time to familiarize themselves with the WSDOT 2020 Standard Specifications prior to bidding the project. In accordance with SMC 7.06.500 and RCW 39.04.350(1), the low bidder shall complete the Supplemental Bidder Responsibility Criteria form located in Appendix C. Failure to promptly submit the form including supporting documentation if required may delay award of the Contract. MBE goal of ten percent ofthe total project bid amount WBE goal ofsix percent ofthe total project bid amount
Award
Sidewalks / Parking Lot
$816,101.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 20, 2020
May 20, 2020
Multiple Locations, Spokane, WA
Related To This Project
Spokane, WA
Bid Date: Mar 04 2019
Spokane, WA
Bid Date: Jan 14 2019
Spokane, WA
Bid Date: Mar 25 2019
Spokane, WA
Bid Date: May 20 2019
Spokane, WA
Bid Date: May 20 2019
Spokane, WA
Bid Date: Feb 25 2019
Spokane, WA
Bid Date: Sep 28 2022
Spokane, WA
Bid Date: Sep 28 2022
Spokane, WA
Bid Date: Aug 31 2022
Spokane, WA
--
Spokane, WA
Bid Date: Aug 24 2022
Spokane, WA
--
Spokane, WA
Bid Date: Aug 26 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
