BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Addition to an educational facility in Lakeville, Minnesota. Completed plans call for the addition of a educational facility.

Please make sure to note the sections of work that you are quoting on your proposal. Proposals that do not include quoted sections may not be considered. there are limited scope packages so teaming with other Prime Contractors may be required to provide a complete bid. Independent School District #194 will receive multiple prime sealed bids for the McGuire Middle School Gymnasium Addition – Bid Package B Bid, until 2:00 p.m. local time on Thursday, April 23, 2020 at the Office of Facilities and Plant Planning,17630 Juniper Path, Suite A, Lakeville, Minnesota, 55044 at which time and place all bids will be publicly opened and read aloud. This Bid Package includes: Demo/Carpentry/Doors/Specialties, Metal Wall Panels, Masonry, Roofing & Sheet Metal, Storefront & Glazing, Drywall, Painting, Demountable Partitions, Acoustical Ceiling Tile, Fire Protection, Plumbing & HVAC, Electrical & Technology, Earthwork & Utilities, Site Concrete and Landscaping. There is a non-mandatory walkthrough for this project on (Friday, April 10th at 8:00 a.m.) This walkthrough is highly recommended for the M/E/P trades. This will be the only walkthrough prior to the bid due date. Interested parties shall meet in the main lobby of the McGuire Middle School. *Please allow for extra time as government guidelines may limit the number of attendees that are able to tour the spaces at one time.* The due date for any questions regarding Bid Package B, will be Tuesday, April 14 at 5:00 p.m. Please direct all questions to Trevor Plasky in writing at: tplasky@loefflerconstruction.com Make proposals on the bid forms supplied in the Project Manual. No oral, telegraphic or telephonic proposals or modifications will be considered. Submit with each bid, a certified check or acceptable bidder’s bond payable to Independent School District #194 in an amount equal to five percent (5%) of the total bid. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond, and Performance Bond. Bids may not be withdrawn within thirty (30) days after the scheduled time of opening bids, without the consent of the Owner. The Owner reserves the right to accept any bid or to reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding.

Bid Results

Educational

$2,684,501.00

Public - City

Addition

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
47
Bidding Soon
787
All Active Projects
340
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2020

June 22, 2020

img_map_placeholder

21220 Holyoke Ave, Lakeville, MN


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.