Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Aurora, Illinois. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
he City of Aurora, Illinois (City) is in need of professional services from a qualified engineering firm for Phase 1 Engineering Services, for the installation of a multi-use path, along Montgomery Road between Middlebury Drive and IL Route 59. As part of the consultant selection process, the City is requesting that you submit a Statement of Qualifications (SOQ) to perform the requested work. The City will have the option to utilize the same consultant for Phase 2 Design Engineering that completed the Phase 1 Study for this project. The proposed multi-use path extension is an off-street facility intended to provide commuters an alternative mode of transportation to get to and from their desired destination. The proposed path shall connect to the recently built (2019) path on Montgomery Road that connects to Waubonsie Creek Trail towards its west end. The path will also connect to other existing regional trails in the area and serve neighborhoods, parks, schools and businesses. The project has CN railroad tracks running north-south direction at the Normantown Road intersection. That section within the Railroad ROW has been awarded the Local Rail-Highway Safety program funds under the Montgomery Road at the Wisconsin Central Limited Tracks Project and an 8 feet wide bike path will be installed over the tracks through that project. The rest of the section on Montgomery Road between Middlebury Drive and IL Route 59 shall be part of this QBS. The proposed improvements include constructing an 8-10 feet wide asphalt Multi-use path, Bicycle and Pedestrian crossing enhancement (s) at intersections, Sidewalk removal, Curb and Gutter removal and replacement, installing appropriate signage, Striping, ADA improvements, installing bike rails (as needed), project essential grading and drainage work, restoration and all other appurtenant work required to complete the project. The proposed multi-use path is intended to go on the north side of Montgomery Road between Middlebury Drive and White Eagle/Meadow Brook Drive and on south side between White Eagle/Meadow Brook Drive and IL Route 59. Phase 1 preliminary engineering shall determine the location of the path between the project limits based on the available right of way and any other constraints that may dictate otherwise. All questions must be received by 12:00 pm (CST) on Friday, July 23, 2021. A response to all questions received will be posted on the Citys website via addendum by 5:00 pm (CST) on Wednesday, July 28, 2021. The SOQ and any questions shall be addressed to the City of Aurora Purchasing Division, at PurchasingDL@aurora.il.us. Any SOQ received after the above noted deadline may not be used as part of the consultant selection process. The email should include the Citys bid number (QBS 21-49). The construction cost of the project is estimated at $1,37000.00. The Method of contractor selection has not been determined at this time.
Conceptual
Roads / Highways
$1,370,000.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 5, 2022
Montgomery Rd, Aurora, IL
Related To This Project
Aurora, IL
--
Aurora, IL
Bid Date: Mar 08 2022
Aurora, IL
Bid Date: Mar 08 2022
Aurora, IL
Bid Date: Mar 23 2022
Aurora, IL
Bid Date: Oct 30 2018
Aurora, IL
Bid Date: Feb 14 2022
Aurora, IL
Bid Date: Mar 09 2022
Aurora, IL
Bid Date: Mar 12 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.