EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 2, 2020 at 8:00 PM

Updated October 1, 2024

Site work for a transportation facility in Claremore, Oklahoma. Completed plans call for site work for a transportation facility.

The Governor of the State of Oklahoma, on March 15, 2020, declared a state-wide emergency due to the impending threat of COVID-19. Gatherings and events of more than 10 people are discouraged and, in some localities, prohibited. Section 110 of the Public Competitive Bidding Act requires that the Bid Opening be open to the public and to bidders. In order to satisfy the requirements of this Act and be responsive to the Governors emergency declaration, members of the public and prospective bidders are encouraged, but not required, to refrain from in person attendance and to view the bid opening through remote videoconferencing. Those bidders who do not wish to attend the bid opening may contact Noelle Hayes at 918-341-1325 ext 134 or nhayes@claremorecity.com for information regarding the ability to remotely attend the bid opening via videoconference. The project includes but is not limited to the replacement of a wind cone and installation of perimeter fencing as shown on the plans and indicated in the specifications. The major items of work include: Removal and replacement of the existing wind cone. Remove the existing entrance gate and install a new 25 inch automatic sliding cantilever gate and operator system. Remove 4,000 LF of existing barbed wire and 4 inch chain-link fence Install 7,000 LF of 8 inch chain-link fence with 3-strand barbed wire. Install 4 manual double swing gates Install pipe frame channel crossing. 1 acre of tree/brush clearing. Bidders must enter the addenda numbers in the Proposal to verify receipt. Proposals shall be accompanied by a cashiers or certified check upon a national or state bank in an amount not less than five percent (5%) of the total maximum bid price payable without recourse to the Owner, or a bid bond in the same amount from a reliable surety company, as a guarantee that the Bidder will enter into a contract and execute performance and payment bonds within ten (10) days after notice of award of Contract to him. Such bid guarantee shall be made payable to Owner. The successful bidder must furnish a performance and payment bond upon the form provided in the amount of one hundred per cent (100%) of the contract price from an approved surety company holding a permit from the State of Oklahoma to act as surety, or other surety or sureties acceptable to the Owner. Certain mandatory federal requirements apply to this solicitation and will be made a part of any contract awarded: 1. Buy American Preferences (Title 49 U.S.C. Chapter 501) 2. Foreign Trade Restrictions (49 CFR 30.17) 3. Davis Bacon Labor Provisions (29 CFR Parts 1, 3, and 5) 4. Requirement for Affirmative Action (41 CFR Part 60-4) 5. Debarment, Suspension, Ineligibility, and Voluntary Exclusion 6. Requirements for Drug-free Workplace Davis Bacon Act wage rules shall apply. All laborers and mechanics employed by contractors and subcontractors on projects funded directly by or assisted in whole or in part by and through the Federal Government shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of Chapter 31 of Title 40, United States Code. The Department of Labor provides all pertinent information related to compliance with labor standards, including prevailing wage rates and instructions for reporting. All bidders and proposers shall make good faith efforts, as defined by Appendix A of 49 CFR Part 26, Regulations of the Office of the Secretary of Transportation, to subcontract a minimum of seven point one-seven (7.17%) percent of the dollar value of the prime contract to small business concerns owned and controlled by socially and economically disadvantaged individuals (DBE). The City of Claremore reserves the right to reject any or all bids, to waive irregularities in the bids and bidding deemed to be in the best interests of the City of Claremore, and to reject nonconforming, nonresponsive, or conditional bids. Bids must remain in effect for 90 days after the bid opening date. Goals for minority participation for each trade: 10.2% Goals for female participation in each trade: 6.9%

Award

Transportation Terminals

$355,388.00

Public - City

Site Work

23

14

4

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Quality Assurance, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Submittals, Bonds, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Gates
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Cables, Low-Voltage Electrical Power Conductors and Cables, Control-Voltage Electrical Power Cables, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Facility Electrical Power Generating and Storing Equipment, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Site Improvements, Fences and Gates, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Transformers, Site Grounding, Site Lightning Protection
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
56
Bidding Soon
737
All Active Projects
372
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2020

July 6, 2020

img_map_placeholder

19502 Rogers Post Rd, Claremore, OK

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Claremore Regional Airport - Replace Wind Cone and Construct Phase 1 Perimeter Fence

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.