BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Oviedo, Florida. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Seminole County Public Works Department desires to retain a consultant to prepare a final design package for construction of roadway improvements to State Road 434 from just west of Jetta Point to just south of Artesia Street. The objective of the project is to widen the roadway, improve roadway safety, construct roundabouts, address drainage issues, add bicycle lanes and sidewalks, etc. It is Seminole County's desire to retain a FDOT prequalified Professional Engineering Firm to perform the aforementioned work. The consultant shall be required to coordinate with FDOT regarding all aspects of the project including (but not limited to) uploading project documents within the ERC system, addressing Seminole County and FDOT comments, preparing cost estimates as required by the FDOT (right-of-way, construction, etc.) according to the systems and methods used by FDOT, providing progress reports, schedule updates, etc. Submittals will be accepted only from firms pre-qualified in the FDOT work types: The Prime Consultant Must be prequalified in Major Work Group 3.2 Major Highway Design, and for the Minor Work Groups (Prime or Sub-Consultant must be pre-qualified and identified within the Prime Consultant's proposal) 4.1.1 Miscellaneous Structures, 6.2 Traffic Signal Timing, 6.3.1 Intelligent Transportation Systems Analysis and Design, 7.1 Signing, Pavement Marking and Channelization, 7.2 Lighting, 7.3 Signalization, 8.1 Control Surveying, 8.2 Design, Right-of-Way and Construction Surveying, 8.3 Photogrammetric Mapping, and 8.4 Right-of-way Mapping. 9.1Soil Exploration 9.2 Geotechnical Classification Lab Testing, and 9.5 Geotechnical Specialty Lab Testing. MWBEs are encouraged to participate in the process, though it is not mandatory and no preference points will be given in the selection process for MWBE participation. Question End Date 5/10/2020 5:00 PM As of June 2, 2021, the project is 30% construction documents complete. The tentative bid schedule for contractors has not been released. The construction will be funded by FDOT through the LAP program. At this time, a construction start date has not been established, but it is assumed that construction will not start before July, 2025.

Design

Roads / Highways

$12,500,000.00

Public - County

Paving, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
67
Bidding Soon
1,162
All Active Projects
509
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.