BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Danville, Virginia. Completed plans call for site work for a water / sewer project.

The City of Danville is soliciting proposals to provide all materials, labor, equipment, supervision and incidentals for a sewer line installation adjacent to 489 Granville Drive. Install approximately 90 linear foot of 8” diameter SDR-35 sewer line. Two (2) manholes must be installed on grade as specified by the engineer. Contractor must install approximately 30’ of 4” PVC or SDR sewer lateral with a clean out at the property line of 489 Granville Drive. All installation must be performed to specifications (see Attachment A). Line must be laid on a 2% grade. Location map is attached to this document. The City reserves the right to reject any or all offers and to waive informalities and minor irregularities in offers received. General Construction Sequence: • Mobilize personnel, materials and equipment. • Set up traffic control in accordance with the Virginia Work Area Protection Manual. Note that the proposed traffic control layout must be approved by the Danville City Engineer, or his designee, before implementation. One lane must be open at all times. Traffic control may be left in place until the project is complete. • Saw cut asphalt. • Excavate material in regard with proper trenching techniques utilized. Place geotextile fabric. • Set manhole at existing end of line. • Install 90’ of 8” diameter SDR-35 pipe at 2% using approved bedding and backfill. • Install second manhole. • Install 4” sewer lateral with cleanout. • All backfill in the street shall be 21A stone. Compaction shall be in 6’ lifts and compaction testing in the road is required by the contractor. • Install base asphalt BM-25 and surface asphalt SM-9.5A asphalt to specified thickness. All completed asphalt patching shall be clean, straight edges. • Reseed yard. • Remove all equipment, excess materials, vehicles and traffic control upon completion. Submittals Prior to the start of work the contractor shall submit the following for approval: • Proposed Traffic Control layout (can be sketch) • Pipe manufacturer cut sheet for mainline and lateral piping, and cleanout components, with recommended bedding requirements. • Manhole shop drawings that include proposed elevations and angles. Completion time: Work is to be completed within 20 calendar days from the documented date of the traffic control being set up. The city reserves the right to charge liquidated damages of $100.00 for each day after the 20 days. Additional time may be granted if deemed appropriate by the city due to weather, unforeseen conditions or special circumstances. Direct Inquiries to: purchasing@danvilleva.gov and Orey Hill at hillot@danvilleva.gov no later than 12pm on April 24, 2020.

Award

Water / Sewer

$65,725.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
114
Bidding Soon
1,744
All Active Projects
768
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 7, 2020

June 8, 2020

June 28, 2020

img_map_placeholder

Granville Dr, Danville, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.