BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 11, 2020 at 7:00 PM

Updated April 21, 2024

Site work for a water / sewer project in Plant City, Florida. Completed plans call for site work for a water / sewer project.

The City of Plant City, Florida seeks bids from qualified storage tank manufactures/suppliers along with a qualified installer team to supply and install two (2) Fiberglass Reinforced Plastics (FRP) circular storage tanks for the storage of Sodium Hypochlorite at Water Treatment Plant No. 2 as indicated herein. The storage tank manufacturer shall be ASME certified to RTP-1, for fiberglass reinforced plastic fabrication. Procurement Manager, Buddy Storey and Contract Specialist, Robert Rosenstein are the only staff designated and authorized to answer questions about this bid. Bidders may rely only on written responses or interpretations from the Procurement Manager and Contract Specialist. Verbal and/or written responses given by other City staff in response to bidder questions shall not be binding on the City. The City shall recognize written addenda issued by the Procurement Manager and the Contract Specialist as the only legitimate method of responding to questions about this bid or the project described within this bid. The deadline to submit questions is May 11, 2020, prior to 3:00 PM. Questions shall be submitted in writing to Mr. Rosenstein at rrosenstein@plantcitygov.com. All answers shall be issued in writing via addendum. The City reserves the right to reject any or all bids at any time and for any reason. Bids submitted after the deadline shall be rejected. Bids submitted in an unsealed or incorrectly marked envelope or box shall be rejected. Fax, e-mail, or telephone bids shall be rejected. Bids which are incomplete, unbalanced, conditional, obscure, or which contain terms or additions not called for, alterations or irregularities of any kind, or which do not comply with the Contract Documents, if applicable, may be rejected at the at the sole discretion of the City.

Under Construction

Water / Sewer

$60,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
324
Active Projects
146
Bidding Soon
2,515
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2020

June 22, 2020

Project location map

2708 E Cherry St, Plant City, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.